FIR10-00560
| INSP-Final Inspection | 2/9/2011 | 2/10/2011 | 2/10/2011 4:01:39 PM | P | PART |
|
|
Fire alarm work passed functional testing. Final pending accurate account information at offsite monitoring regarding zone descriptors and signals recieved.
|
BLD10-02486
| FIRE-Final Inspection | 2/9/2011 | 2/10/2011 | 2/10/2011 3:58:24 PM | P | PASS |
|
|
Fire life safety passed. Note: door hardware at the reception desk to be reversed for compliance with egress req.- prior to structrual inspection.
|
BLD10-02371
| FIRE-Final Inspection | 2/9/2011 | 2/10/2011 | 2/10/2011 3:54:36 PM | A | PASS |
|
|
Fire life safety final okayed. Note: fire alarm permit under review for the radio transmitter addition to the exisitng FACP.
|
FIR11-00016
| INSP-Final Inspection | 2/9/2011 | 2/10/2011 | 2/10/2011 3:52:47 PM | A | PASS |
|
|
Recieved as-built plans from contractor regarding deleted head at the covered patio per NFPA 13 2007 8.15.7.3(1) exception. C/N items finished, permit finaled.
|
FIR10-00659
| INSP-Sprinkler Rough-in | 2/9/2011 | 2/10/2011 | 2/10/2011 3:49:05 PM | A | PART |
|
|
Overhead rough-in passed inspection, noted sw heads at the garages are not yet installed, riser or supply manifolds are not ready at this time. Contractor to call for inspection of batt insulation at the first floor piping prior to cover- (tented areas okayed).
|
BLD10-02572
| FIRE-Final Inspection | 2/9/2011 | 2/10/2011 | 2/10/2011 3:44:05 PM | A | PASS |
|
|
Fire life safety passed.
|
FIR10-00649
| INSP-Final Inspection | 2/9/2011 | 2/10/2011 | 2/10/2011 3:43:24 PM | A | PASS |
|
|
Reinspection passed, permit finaled.
|
FIR11-00016
| INSP-Final Inspection | 2/9/2011 | 2/10/2011 | 2/9/2011 4:39:03 PM | A | CANC |
|
|
jason Phone #: ###-#### Inspection cancelled from web by: Stan Beus
|