Inspections for the day of: Thursday, February 10, 2011.
Number of inspections: 4
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorSteven Webb
Title 
Phone #794-9491
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC08-00721 Aging Inspection2/10/20112/10/20112/10/2011 3:28:29 PM DONE
ESC08-00721 DOC - Permit Finaled2/10/20112/10/20112/10/2011 3:28:16 PMPPASS
ESC09-00352 General Inspection2/10/20112/10/20112/10/2011 3:23:01 PMPPASS
Met with Wetlands, (Gary H & Brent) & Brighton, (J. Walker) plus Boise City C. Smith. Reviewed project, summary: Welling to continue to be worked, re-graded and re-vegetated. Park area will continue to get green up completed, majority to have vegetation established this spring and summer. The majority of the area slated for vertical construction (east of Parkcenter) have been sprayed with tackifier. Other vertical construction area west of Parkcenter will be sprayed with binder relatively soon after final grading is completed. Welling is open all the way to the river, continue to have controls, including basins inserted into the drainage to allow for sediment to drop out prior to the discharge point, plus misc. sediment barriers until final completion of the Wellings work and then re-establishment of vegetation. The Penn canel will be piped soon which will totally seperated Wellings and Penn from merging. Penn will flow into the existing drainage and Wellings will flow from east to west through the park Green up along the entire area of Wellings is needed along with some additional hardsurface green belt. Reminded operators of the need to inspect and stablize as set forth in the Federal Construction General Permit.
ESC10-00657 General Inspection2/10/20112/10/20112/10/2011 1:13:45 PMPPART
Sign not posted, minor rilling, Verbal to RP.