FIR11-00479
| INSP-Sprinkler Rough-in | 2/10/2012 | 2/10/2012 | 2/10/2012 2:35:23 PM | P | FAIL |
|
|
The sprinkler fitter was not ready for an inspection. He will reschedule for monday.
|
BLD07-01363
| FIRE-Final Inspection | 2/9/2012 | 2/10/2012 | 2/10/2012 2:21:25 PM | A | PASS |
|
|
Life safety passed. A smoke alarm in unit 104 was repaired while I waited.
|
FIR12-00022
| INSP-Final Inspection | 2/9/2012 | 2/10/2012 | 2/10/2012 11:59:30 AM | A | PASS |
|
|
Permit finaled. The netcon was a 5.
|
FIR11-00671
| INSP-Final Inspection | 2/10/2012 | 2/10/2012 | 2/10/2012 10:58:32 AM | P | PASS |
|
|
Permit finaled
|
BLD11-02578
| FIRE-Final Inspection | 2/9/2012 | 2/10/2012 | 2/10/2012 10:58:14 AM | A | FAIL |
|
|
Mount the fire extinguisher on the column in the sales/kitchen area as shown on the approved plans. The double exit doors by the Nutritunist room have one leaf that is welded shut and the panic hardware has been removed. This door needs to be returned to a functional condition or have the architect contact plan review for another consideration/alternative. Provide occupant load sign "66" for the Assembly area at the Display Kitchen. The main exit door out the front of the building has a motorized roll down security door that can be utilized to block the door. This door is not shown on the floor plans but is shown on a iso view on another plan sheet. This door does not have ADA compliant hardware. This door needs to be permanantly disabled or meet all door requirements of IFC chapter 10. Contact the building plan review for direction prior to installing hardware. Provide signage for the fire sprinkler riser location as per review note #8 and per discussion.
|
FIR12-00009
| INSP-Final Inspection | 2/9/2012 | 2/10/2012 | 2/10/2012 10:47:43 AM | A | FAIL |
|
|
The minimum End of Line voltage did not meet the requirements of fire alarm plan review note #20. The city approved plans indicate that 14 guage wire is to be used on the notification circuits. Instead 12 guage wire has been installed from the FACP to a junction box in the Boiler room. 14 guage has installed from the juction box to the horn/strobes. Provide as-built drawings showing the actual wire guage and routing if needed.
|