BLD13-02311
| FIRE-Final Inspection | 2/10/2014 | 2/10/2014 | 2/10/2014 5:07:32 PM | P | NR |
|
|
Items noted include; suite address, post max occupant load sign, post signage at the second exit passageway per review note #3, project related fire sprinkler permit needs finaled.
|
FIR14-00017
| INSP-Final Inspection | 2/7/2014 | 2/10/2014 | 2/10/2014 5:04:48 PM | P | PASS |
|
|
Fire alarm testing passed. Permit finaled.
|
FIR13-00587
| INSP-Final Inspection | 2/10/2014 | 2/10/2014 | 2/10/2014 4:35:53 PM | P | PASS |
|
|
Scope of fire alarm testing passed. Permit finaled.
|
FIR13-00475
| INSP-Final Inspection | 2/10/2014 | 2/10/2014 | 2/10/2014 4:32:57 PM | P | PASS |
|
|
Coverage adjustments finished, final walkthrough passed. Fire sprinkler permit finaled.
|
BLD13-00904
| FIRE-Final Inspection | 2/10/2014 | 2/10/2014 | 2/10/2014 4:29:10 PM | P | PASS |
|
|
Fire life safety inspection completed acceptable.
|
BLD13-03606
| FIRE-Final Inspection | 2/7/2014 | 2/10/2014 | 2/10/2014 1:30:51 PM | P | PASS |
|
|
Fire life safety inspection completed satisfactory.
|
FIR13-00544
| INSP-Final Inspection | 2/10/2014 | 2/10/2014 | 2/10/2014 1:02:24 PM | A | PASS |
|
|
Fire sprinkler permit final approved.
|
BLD13-03353
| FIRE-Conference | 2/10/2014 | 2/10/2014 | 2/10/2014 12:58:58 PM | A | DONE |
|
|
On site conference regarding fire life safety items and project related FIR trade permit work.
|
FIR13-00661
| INSP-Sprinkler Rough-in | 2/10/2014 | 2/10/2014 | 2/10/2014 12:54:07 PM | A | PART |
|
|
Exam rooms 1st floor north end okayed for cover.
|