Inspections for the day of: Tuesday, February 10, 2015.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC14-00328 General Inspection2/10/20152/10/20152/10/2015 4:22:08 PM CANC
rescheduled
ESC14-00310 General Inspection2/10/20152/10/20152/10/2015 3:36:06 PM CANC
ESC14-00303 General Inspection2/10/20152/10/20152/10/2015 3:36:00 PM CANC
ESC13-01237 Aging Inspection2/10/20152/10/20152/10/2015 3:35:34 PM PASS
WIP. No violations. Homeowner RP
ESC14-00300 General Inspection2/10/20152/10/20152/10/2015 3:29:05 PM CANC
rescheduled
ESC14-00166 Aging Inspection2/10/20152/10/20152/10/2015 3:28:28 PM PASS
Construction complete. BLD still open; ESC permit conditions satisfied.
ESC14-00166 DOC - Permit Finaled2/10/20152/10/20152/10/2015 3:28:00 PMPPASS
ESC14-00443 General Inspection2/10/20152/10/20152/10/2015 3:27:27 PM CANC
rescheduled
ESC14-00608 Complaint Inspection2/10/20152/10/20152/10/2015 11:58:14 AMPPASS
Large muddy puddle interferring with traffic on Warm Springs reported.

Called Knife River RP Jeff to check on situation & request response. Puddle is due to the fact that muddy conditions have prevented completion of the storm drain system in that area of concern to connect it to the new stormwater retention pond south of Warm Springs. If that water was not contained on site there, it would discharge to Warm Springs Creek which flows to Boise River.

To solve the issue a temporary berm was built further up in the development's staging area and water was pumped on the other side of berm so it would not be on roadway.

Crew was onsite upon arrival and puddle has subsided. Knife River/Dallas Harris will continue to work to clean up that area and hopefully be able to complete the stormwater system. The temporary berm solution appears to be working currently. No trackout or discharges offsite occuring.

Note: Mud along side roadway will be cleaned when the powerline & utility project progresses. Utility project is in ACHD R.O.W. so not permitted through City of Boise.
ESC14-00237 General Inspection2/10/20152/10/20152/10/2015 10:00:57 AM PASS
Outdoors seating pavillion in parking lot is in progress. No trackout or offsite muddy discharges.
ESC13-01006 General Inspection2/10/20152/10/20152/10/2015 9:25:08 AM PASS
ESC14-00143 Aging Inspection2/10/20152/10/20152/10/2015 8:23:40 AM PASS