ELE16-04017
| Electrical Rough-In | 2/9/2017 | 2/10/2017 | 2/10/2017 1:51:42 PM | A | PASS |
|
|
North ; South Stairwell....George Morris is contact at ###-####. thank you. Phone #: ###-#### Inspection requested via web by Debby Pierce Area noted rough in ok cover
|
ELE17-00324
| Electrical Rough-In | 2/9/2017 | 2/10/2017 | 2/10/2017 1:09:44 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by steve ragan Phase 2 will be 2 conference rooms and 1 office. Today phase 1, 3 offices, break and work area wall rough in ok cover
|
ELE16-03412
| Final | 2/9/2017 | 2/10/2017 | 2/10/2017 1:05:51 PM | P | PASS |
|
|
9th floor correction inspection Phone #: ###-#### Inspection requested via web by steve ragan Final ok
|
ELE15-01348
| Conference | 2/10/2017 | 2/10/2017 | 2/10/2017 11:24:53 AM | P | DONE |
|
|
Spoke with Joe, General Foreman with Hoffman to address incomplete raceway covers and firewall penetrations on elevator wireways. Annex 5th floor elevator control room and elevator lobby. All will need to by completed before final inspection.
|
ELE17-00244
| Electrical Rough-In | 2/9/2017 | 2/10/2017 | 2/10/2017 10:05:48 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Rowdy Monroe 210.52(B)- All receptacle outlets located in kitchen and dining areas shall be fed by a 20 amp small appliance circuit. 2 on north wall of kitchen dining area.
|