BLD96-01205
| INSP - Carpentry | 2/11/1997 | 2/11/1997 | 2/11/1997 12:00:00 AM | | PART |
|
|
/ / 340 - C WING; OK TO INSUL & PLACE 1ST LAYER LIDS; INSUL CAT WALK F
|
BLD96-01205
| INSP - Conference | 2/11/1997 | 2/11/1997 | 2/11/1997 12:00:00 AM | | PASS |
|
|
/ / 340 - SPOKE W/ SODERSTROM ARCH'S: WILL SUBMIT DETAIL RE 2 HR WALLS INCREASE BY YARD SEPARATION. WILL CONSULT W/ JOHN MENARD
|
BLD96-00731
| INSP - Final | 2/11/1997 | 2/11/1997 | 2/11/1997 12:00:00 AM | | FAIL |
|
|
/ / 340 - keep c/n, need all sigs. sent to perry in error
|
BLD96-02291
| INSP - Letter of compliance | 2/11/1997 | 2/11/1997 | 2/11/1997 12:00:00 AM | | PASS |
|
|
/ / 340 - LC 13263
|
BLD96-02291
| INSP - Letter of compliance | 2/11/1997 | 2/11/1997 | 2/11/1997 12:00:00 AM | | PASS |
|
|
/ / 340 - LC 13263
|
BLD96-02477
| INSP - Footings | 2/11/1997 | 2/11/1997 | 2/11/1997 12:00:00 AM | | PART |
|
|
/ / 340 - col ftgs poured; pending spec insp report
|
BLD96-02845
| INSP - Framing/Rough-in | 2/10/1997 | 2/11/1997 | 2/11/1997 12:00:00 AM | A | FAIL |
|
|
02/10/97 340 - FRAME REINSPECT...c/n,fireblocking
|
BLD96-02845
| INSP - Energy code compliance | 2/10/1997 | 2/11/1997 | 2/11/1997 12:00:00 AM | A | FAIL |
|
|
02/10/97 340 - c/n,need complete insul, r19 at gar or wattsun
|
BLD96-03187
| INSP - Framing/Rough-in | 2/10/1997 | 2/11/1997 | 2/11/1997 12:00:00 AM | A | FAIL |
|
|
02/10/97 340 - nr
|
BLD96-03187
| INSP - Energy code compliance | 2/10/1997 | 2/11/1997 | 2/11/1997 12:00:00 AM | A | FAIL |
|
|
02/10/97 340 - c/n, nr
|
BLD97-00187
| INSP - Footings | 2/10/1997 | 2/11/1997 | 2/11/1997 12:00:00 AM | A | PART |
|
|
02/10/97 340 - footings poured, looks ok, no plan; has isolated ftgs at
|
BLD97-00249
| INSP - Siding | 2/10/1997 | 2/11/1997 | 2/11/1997 12:00:00 AM | A | PART |
|
|
02/10/97 340 - TO RECOVER 19 SQUARES WITH ALLOY SIDING- WORK IN PROGRESS wip,looks good
|
BLD96-02447
| INSP - Footings | 2/10/1997 | 2/11/1997 | 2/11/1997 12:00:00 AM | A | PART |
|
|
02/11/97 340 - FOOTING COLUMNS....NEED SPEC INSP'S REPORT
|
BLD96-00731
| INSP - Final | 2/10/1997 | 2/11/1997 | 2/11/1997 12:00:00 AM | A | FAIL |
|
|
02/11/97 340 - FINAL FOR C/O...KEEP C/N, NEED COMPLETE DOOR HDWE & FIRES
|
BLD96-01906
| INSP - Carpentry | 2/11/1997 | 2/11/1997 | 2/11/1997 12:00:00 AM | P | PART |
|
|
02/11/97 340 - bond beam on blck inspection...MASONRY; PENDING SPEC INSP
|
BLD96-02291
| INSP - Final | 2/11/1997 | 2/11/1997 | 2/11/1997 12:00:00 AM | P | PASS |
|
|
02/11/97 340 - OK
|
BLD96-00464
| INSP - Carpentry | 2/10/1997 | 2/11/1997 | 2/11/1997 12:00:00 AM | P | PART |
|
|
02/11/97 340 - 1ST LAYER LIDS A WING
|
BLD97-00068
| INSP - Footings | 2/11/1997 | 2/11/1997 | 2/11/1997 12:00:00 AM | P | PASS |
|
|
02/11/97 340 - check straps...INSTALLING BOLTS FOR HOLD DOWNS AT FRONT O FLOOR FRAMING OK
|