BLD97-00401
| INSP - Framing/Rough-in | 2/11/1998 | 2/11/1998 | 2/11/1998 12:00:00 AM | P | PART |
|
|
chk 2hr wall at chiller tank, if tank removed; wall redone??? TANK GONE, WALL REDONE; NEED FIRESTOP DETAILING
|
BLD97-00494
| INSP - Final | 2/9/1998 | 2/11/1998 | 2/11/1998 12:00:00 AM | P | PART |
|
|
EARLY PM 2:30 CALL ED HESS ###-#### OR ###-####1 STRUCT OK; CARD TO ED HESS
|
BLD97-01848
| INSP - Framing/Rough-in | 2/12/1998 | 2/11/1998 | 2/11/1998 12:00:00 AM | P | PART |
|
|
NOT FRAME INSP...CONF W/ CONTRACTOR, CREW WORKS NITES...TOLD OK TO CONTINUE WORK, 1-SIDE ONLY...CONTACT ARCH.
|
BLD97-01848
| INSP - Framing/Rough-in | 2/11/1998 | 2/11/1998 | 2/11/1998 12:00:00 AM | P | FAIL |
|
|
GILL-###-####...C/N: SUSPENDED PARTITIONS NOT PER DETAIL, NEED PROOF OF PROPER ASBESTOS ABATEMENT & REMOVAL PER SPECS. ARCH. TO OK AS BUILT OR??
|
BLD97-02259
| INSP - Wall cover | 2/12/1998 | 2/11/1998 | 2/11/1998 12:00:00 AM | P | NR |
|
|
CONF W/ JOEL; NEED COMPLETE 1HR DETAILS...
|
BLD97-02459
| INSP - Framing/Rough-in | 2/11/1998 | 2/11/1998 | 2/11/1998 12:00:00 AM | P | PASS |
|
|
BRIAN ###-#### ENG'G OK
|
BLD97-02459
| INSP - Energy code compliance | 2/12/1998 | 2/11/1998 | 2/11/1998 12:00:00 AM | P | PASS |
|
|
HI-R REMOVED AT CONCEALED SPACES; INSUL OK
|
BLD97-03581
| INSP - Framing/Rough-in | 2/10/1998 | 2/11/1998 | 2/11/1998 12:00:00 AM | P | PART |
|
|
ceiling grid tony ###-#### pager...LOOKS OK, CHECK DRAFT STOP AT FINAL???
|