BLD97-01112
| INSP-Final Inspection | 2/10/1998 | 2/11/1998 | 2/11/1998 12:00:00 AM | A | PASS |
|
|
###-#### NEIL BROWN\\HE WANTS THIS BEFORE 11:30
|
BLD97-01324
| INSP-Sprinkler Rough-in/Hydro | 2/10/1998 | 2/11/1998 | 2/11/1998 12:00:00 AM | A | PASS |
|
|
###-#### SHELLIE 2nd floor only rough-in okay
|
BLD97-02476
| INSP-Conference | 2/11/1998 | 2/11/1998 | 2/11/1998 12:00:00 AM | P | PART |
|
|
discussed curtain board design/area coverage. areas under boards are over 3,000 sq ft. steed to contact hummel about problem.
|
BLD97-03425
| INSP-Final Inspection | 2/11/1998 | 2/11/1998 | 2/11/1998 12:00:00 AM | P | PASS |
|
|
BLDG B--DENNIS ###-####
|