ELE99-04601
| Final | 2/10/2000 | 2/11/2000 | 2/11/2000 12:00:00 AM | A | FAIL |
|
|
IF LOCKED THERE IS A PHONE BOX ON THE WEST SIDE, THERE IS A KEY THERE\\###-#### GEORGE Need to meet contractor at job. He to call for reinspect Monday 2/14/00. 2/14/00 12:00:43 PM
|
ELE99-03856
| Electrical Rough-In | 2/11/2000 | 2/11/2000 | 2/11/2000 12:00:00 AM | P | FAIL |
|
|
addition on back\\ ###-#### NEC 210-52 (a) (1) correction. 2/14/00 12:01:18 PM
|
ELE00-00494
| Temporary Service | 2/11/2000 | 2/11/2000 | 2/11/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 02/11/2000 at 08:34:14. Contact: ###-####. T/S U/G N ok. 2/14/00 12:01:32 PM
|
ELE99-03531
| Final | 2/11/2000 | 2/11/2000 | 2/11/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 02/11/2000 at 09:36:16. Contact: ###-####. Final ok. 2/14/00 12:01:25 PM
|
ELE00-00418
| Electrical Rough-In | 2/10/2000 | 2/11/2000 | 2/11/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 02/10/2000 at 12:03:27. Contact: ###-####. P/S U/G N Final ok. R/I ok to cover. 2/14/00 12:00:58 PM
|