BLD01-02222
| BLD-Foundation | 2/8/2002 | 2/11/2002 | 2/11/2002 12:00:00 AM | A | PASS |
|
|
###-####/ 9a.m. rebar ok retaining wall/ pending special insp. report. 2/11/2002 8:40:05 AM
|
BLD01-03151
| BLD-Wall cover | 2/8/2002 | 2/11/2002 | 2/11/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 02/08/2002 at 16:25:42. Contact: .
|
BLD01-01646
| BLD-Conference | 2/8/2002 | 2/11/2002 | 2/11/2002 12:00:00 AM | A | NR |
|
|
###-#### Tom Heinz please call befor going out. need to sort out all permits. 2/11/2002 2:27:10 PM
|
BLD01-01863
| BLD-Concrete | 2/11/2002 | 2/11/2002 | 2/11/2002 12:00:00 AM | P | PART |
|
|
dave ###-#### 4' to 8' rebar ok 2/11/2002 1:50:36 PM
|
MEC02-00367
| Final | 2/11/2002 | 2/11/2002 | 2/11/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 02/11/2002 at 08:23:10. Contact: ###-####.
|
BLD01-03166
| BLD-Framing/Rough-in | 2/11/2002 | 2/11/2002 | 2/11/2002 12:00:00 AM | P | PART |
|
|
###-#### call first need ele approval/ ok to insulate upon approval need rat run lateral bracing and top plate wire fire blk. 2/11/2002 2:41:16 PM
|