Inspections for the day of: Monday, February 11, 2002.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorPat Lass
TitleELE-INSPECTOR
Phone #794-9478
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE02-00106 Electrical Rough-In2/8/20022/11/20022/11/2002 12:00:00 AMAPASS
###-####
ELE01-01960 Final2/4/20022/11/20022/11/2002 12:00:00 AMAFAIL
DEBORAH - ###-#### bond water within 5 feet and proper clamp on groundrod 2/11/2002 11:00:51 AM
ELE01-03888 Electrical Rough-In2/8/20022/11/20022/11/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 02/08/2002 at 10:23:52. Contact: ###-####.
ELE01-04123 Electrical Rough-In2/10/20022/11/20022/11/2002 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 02/10/2002 at 23:11:34. Contact: ###-####. posted correction for service done without a permit. 2/11/2002 3:31:30 PM
ELE01-02458 Final2/11/20022/11/20022/11/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 02/11/2002 at 08:45:22. Contact: ###-####.entire building and outside pedestal
ELE02-00352 Rough-In Permanent Service2/11/20022/11/20022/11/2002 12:00:00 AMPPASS
###-####
P/S U/G N Ok Passed
R/I OK 2/11/2002 2:52:51 PM