MEC02-00360
| Conference | 2/7/2002 | 2/11/2002 | 2/11/2002 12:00:00 AM | A | CANC |
|
|
AIR CARE
|
MEC02-00374
| Pressure Test | 2/8/2002 | 2/11/2002 | 2/11/2002 12:00:00 AM | A | PASS |
|
|
pres test phil--###-####
|
MEC02-00361
| Rough-in | 2/8/2002 | 2/11/2002 | 2/11/2002 12:00:00 AM | A | PART |
|
|
larger flex at rtu, and remove vent limiters at pressure reducing regulators 2/11/2002 12:28:54 PM
|
MEC02-00361
| Pressure Test | 2/8/2002 | 2/11/2002 | 2/11/2002 12:00:00 AM | A | PART |
|
|
pt ok, no gas piping sizing 2/11/2002 12:29:23 PM
|
MEC02-00382
| Final | 2/11/2002 | 2/11/2002 | 2/11/2002 12:00:00 AM | P | FAIL |
|
|
no answer to call or anyone home 2/11/2002 3:02:53 PM
|
MEC01-03509
| Final | 2/11/2002 | 2/11/2002 | 2/11/2002 12:00:00 AM | P | PASS |
|
|
###-#### b j fn =re-insp
|
MEC02-00336
| Rough-in | 2/11/2002 | 2/11/2002 | 2/11/2002 12:00:00 AM | P | PART |
|
|
need metal support at flex 2/11/2002 2:36:30 PM
|
MEC02-00336
| Pressure Test | 2/11/2002 | 2/11/2002 | 2/11/2002 12:00:00 AM | P | PART |
|
|
pres test ok, no pipe sizing 2/11/2002 2:36:51 PM
|
MEC02-00341
| Final | 2/11/2002 | 2/11/2002 | 2/11/2002 12:00:00 AM | P | FAIL |
|
|
no gas shut off at furn. 2/11/2002 2:07:02 PM
|
MEC02-00360
| Rough-in | 2/11/2002 | 2/11/2002 | 2/11/2002 12:00:00 AM | P | NR |
|
|
r/i b j ###-####
|
MEC02-00390
| Final | 2/11/2002 | 2/11/2002 | 2/11/2002 12:00:00 AM | P | PASS |
|
|
TML ###-#### HOME OWNER ###-####
|