BLD02-00125
| BLD-Footing | 2/8/2002 | 2/11/2002 | 2/11/2002 12:00:00 AM | A | PART |
|
|
###-####
|
BLD01-02863
| BLD-Framing/Rough-in | 2/8/2002 | 2/11/2002 | 2/11/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 02/08/2002 at 13:11:17. Contact: ###-####.west wall ok. 2/11/2002 11:12:12 AM
|
BLD01-02254
| BLD-Final | 2/8/2002 | 2/11/2002 | 2/11/2002 12:00:00 AM | A | PASS |
|
|
###-#### ok perm oc. 2/11/2002 10:46:23 AM
|
BLD01-02802
| BLD-Concrete | 2/11/2002 | 2/11/2002 | 2/11/2002 12:00:00 AM | P | PART |
|
|
###-#### partial trench inspection
|
BLD01-02505
| BLD-Framing/Rough-in | 2/8/2002 | 2/11/2002 | 2/11/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 02/08/2002 at 14:35:40. Contact: ###-####. 5 foot tall walls . rest room ceiling needs support at the wall removed will check above grid at final. 2/11/2002 3:53:23 PM
|