PLM02-00906
| Plumbing Rough-in | 2/10/2003 | 2/11/2003 | 2/11/2003 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 2/10/2003 at 1:33:15 PM. Contact: ###-####.-FOR" B" AREA EAST END RESTROOMS piping in the walls of restrom only area b east end. 2/11/2003 11:18:25 AM
|
PLM03-00139
| Plumbing Rough-in | 2/10/2003 | 2/11/2003 | 2/11/2003 12:00:00 AM | A | FAIL |
|
|
CHARLES 1-###-#### waste and water to washer must be protected from freezing, repipe wc waste and vent use approved fittings and transittion couplings, vent tub trap, remove black iron pipe in water to tub, remove compression fittings in water at tub and replace with crimps, pex must not be with in 18"of water heater, provide shutoff valve, pipe t&p and required water heater pan drain to a sump with a pump that will handle discharge from t&p drain apx25 gpm, replace old t&p drain. 2/11/2003 9:54:58 AM
|
PLM01-03727
| Final | 2/11/2003 | 2/11/2003 | 2/11/2003 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 2/11/2003 at 7:38:03 AM. Contact: ###-####. final ok 2/11/2003 3:57:53 PM
|
PLM03-00331
| Groundwork | 2/11/2003 | 2/11/2003 | 2/11/2003 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 2/11/2003 at 9:10:10 AM. Contact: ###-####.
|
PLM02-03726
| Final | 2/11/2003 | 2/11/2003 | 2/11/2003 12:00:00 AM | P | PASS |
|
|
###-#### final ok 2/11/2003 4:10:57 PM
|
PLM03-00317
| Plumbing Rough-in | 2/11/2003 | 2/11/2003 | 2/11/2003 12:00:00 AM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung ri ok 2/11/2003 2:27:01 PM
|
PLM03-00303
| Water and/or Sewer | 2/11/2003 | 2/11/2003 | 2/11/2003 12:00:00 AM | P | PASS |
|
|
sewer service final ok 2/11/2003 4:45:00 PM
|
PLM02-03550
| Plumbing Rough-in | 2/10/2003 | 2/11/2003 | 2/11/2003 12:00:00 AM | P | CANC |
|
|
|