ELE05-00367
| Rough-In Permanent Service | 2/10/2005 | 2/11/2005 | 2/11/2005 12:00:00 AM | A | PASS |
|
|
called contractor to staple one wire, and to put on a couple of nailplates. ric ok p/s u/g n ok 2/11/2005 10:05:28 AM
|
ELE05-00372
| Electrical Rough-In | 2/10/2005 | 2/11/2005 | 2/11/2005 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 2/10/2005 at 4:56:31 PM. Contact: ###-####. 110.26(A)(1) depth of work space shall be 3', 358.26 there shall be max 360 degree bends, 348.30 fmc shall be supported witin 12" of box, 210.63 gfci shall be provided on roof for refrigeration units, 110.3(B) equipment shall be listed 2/11/2005 11:51:54 AM
|
ELE05-00241
| Conference | 2/9/2005 | 2/11/2005 | 2/11/2005 12:00:00 AM | A | DONE |
|
|
Please call at least a half hour prior to inspection///consultation, please contact Matt Murray, thank you.; Phone #: ###-#### Internet Inspection Request from: Wendy Waters talked about code requirement to install raceways and to bring exst raceways up to code. Specifically flex to floor boxes. 2/11/2005 8:39:29 AM
|
ELE05-00458
| Final | 2/10/2005 | 2/11/2005 | 2/11/2005 12:00:00 AM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Dana Moyer ok to final 2/11/2005 8:26:45 AM
|
ELE05-00284
| Electrical Rough-In | 2/10/2005 | 2/11/2005 | 2/11/2005 12:00:00 AM | P | PASS |
|
|
Underground Insp. Please contact Steve, thank you; Phone #: ###-#### Internet Inspection Request from: Wendy Waters ok to cover conduit from south towards fence for power and to west towards fence for power and communications. 2/11/2005 4:45:57 PM
|
ELE04-03339
| Final | 2/11/2005 | 2/11/2005 | 2/11/2005 12:00:00 AM | P | FAIL |
|
|
allen; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles 110.12(C) there shall be no damaged parts(service riser), 352.30(A) rnc shall be supported within 3" of box, 406.4 recepts shall be securely fastened called contr, left corr notice 2/11/2005 12:21:11 PM
|
ELE04-02595
| Electrical Rough-In | 2/11/2005 | 2/11/2005 | 2/11/2005 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 2/11/2005 at 8:39:31 AM. Contact: ###-####. 2nd floor so of elev bath clg ric 2/11/2005 2:56:04 PM
|
ELE05-00206
| Rough-In Permanent Service | 2/11/2005 | 2/11/2005 | 2/11/2005 12:00:00 AM | P | PASS |
|
|
Plans are on site per builder, Wayne Swanson ###-####; Phone #: ###-#### Internet Inspection Request from: William Zerfas called contr, left survey for250.64(D) grounding electrode conductor shall not be spliced in panel 2/11/2005 2:05:13 PM
|
ELE05-00465
| Rough-In Permanent Service | 2/11/2005 | 2/11/2005 | 2/11/2005 12:00:00 AM | P | FAIL |
|
|
dale ###-####210.52(A)(1) recepts shall be spaced so no point is over 6' from recpt. 2/11/2005 1:03:36 PM
|