Inspections for the day of: Monday, February 11, 2008.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR07-00961 INSP-Final Inspection2/11/20082/11/20082/11/2008 5:19:36 PMPPASS
Fire sprinkler permit finaled.
FIR07-00954 INSP-Final Inspection2/8/20082/11/20082/11/2008 2:56:31 PMAPASS
FIR07-00243 INSP-Final Inspection2/8/20082/11/20082/11/2008 2:55:44 PMAPASS
Fire sprinkler system final testing passed, previous correction items are complete, plan resubmittals provided, three defficiencies noted at today's inspection repaired while on site, dry system trip test and DCVA forward flow testing passed. See project related permit FIR06-00727 for the balance of activities and inspections completed for this overhead work listed under the UG permit due to contractor mixing permit #'s for site inspeciton requests.
FIR08-00051 INSP-Sprinkler Rough-in/Hydro2/8/20082/11/20082/11/2008 2:46:41 PMAPART
OH rough-in installation passed inspection, see annotations on plan with today's date, hydrostatic testing for this remodel area also completed acceptable.
BLD07-00873 FIRE-Final Inspection2/8/20082/11/20082/11/2008 11:51:03 AMAFAIL
Final pending project related fire alarm work to interconnect mag locks at the elevator lobby exit doors to the fire alarm panel and provision of access controled egress components per IFC 2003 1008.1.3.4 items 1-6.
FIR08-00090 INSP-Sprinkler Rough-in/Hydro2/8/20082/11/20082/11/2008 11:46:13 AMAPASS
Fire sprinkler modifications are acceptable, inspection passed, permit is okay for final.
FIR07-01037 INSP-Final Inspection2/8/20082/11/20082/11/2008 11:04:26 AMAFAIL
Strobe notification devices need to be synchronized per NFPA 72 requirements..