ELE08-03065
| Final | 2/10/2009 | 2/11/2009 | 2/11/2009 3:46:15 PM | P | PART |
|
|
daniel - please call 1/2 hr prior Phone #: ###-#### t/o ok card signed needs to address low voltage supported on conduit 300.11
|
ELE09-00223
| Final | 2/11/2009 | 2/11/2009 | 2/11/2009 2:27:59 PM | P | NR |
|
|
butch - late afternoon please Phone #: ###-#### range, dryer , and j box ok , service drop needs to meet 230.9(B), and 230.24(B), the drop is installed now so clearence can be inspected. Pat give me a call Jack , and I will explain
|
ELE08-02414
| Electrical Rough-In | 2/11/2009 | 2/11/2009 | 2/11/2009 1:47:31 PM | P | PASS |
|
|
Please call 1/2 hr before going out Keith Phone #: ###-#### ok
|
ELE09-00149
| Electrical Rough-In | 2/11/2009 | 2/11/2009 | 2/11/2009 12:44:13 PM | P | PART |
|
|
Mike please call 10 min before going out Phone #: ###-#### 1st and 2nd floor public corridor har ceilings ok told contr needs to maintain spacing for MC or derate per table 310.15 (B)(2)(a) he will correct and provide spacing anop
|
ELE09-00178
| Electrical Rough-In | 2/9/2009 | 2/11/2009 | 2/11/2009 10:15:58 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 2/9/2009 at 9:44:05 AM. Contact: ###-####. did inspection 02-10-09
|
ESC08-00532
| Random Inspection | 2/11/2009 | 2/11/2009 | 2/11/2009 9:57:02 AM | A | PART |
|
|
some clean up has been done but ground snow covered, Clint is scheduled to do foolw up inspection 02-12-09
|
ELE08-02905
| Electrical Rough-In | 2/10/2009 | 2/11/2009 | 2/11/2009 9:54:19 AM | A | PART |
|
|
Please provide ceiling inspection for Area C. Phone #: ###-#### Internet Inspection Request from: Spencer Mclean ceilings and u/g anop
|
ESC08-00887
| General Inspection | 2/11/2009 | 2/11/2009 | 2/11/2009 8:49:48 AM | A | PASS |
|
|
ok
|
ELE08-03220
| Final | 2/10/2009 | 2/11/2009 | 2/11/2009 8:49:01 AM | A | FAIL |
|
|
jeremy Phone #: ###-#### corr fee due called 210.8 gfci for wet bar and bathrm , 408.4 panel schedule all messed up
|