BLD08-00684
| BLD-Final | 2/11/2009 | 2/11/2009 | 2/11/2009 6:49:34 PM | P | CANC |
|
|
Re-Sched.....
|
BLD09-00062
| BLD-Framing/Rough-in | 2/10/2009 | 2/11/2009 | 2/11/2009 6:47:25 PM | A | FAIL |
|
|
jason Phone #: ###-#### C/N Need to install bracing at top of all walls.
|
ESC09-00023
| General Inspection | 2/11/2009 | 2/11/2009 | 2/11/2009 4:24:17 PM | P | PASS |
|
|
|
BLD08-02561
| BLD-Conference | 2/10/2009 | 2/11/2009 | 2/11/2009 4:23:59 PM | A | DONE |
|
|
Mark Phone #: ###-####
|
BLD09-00120
| BLD-Framing/Rough-in | 2/11/2009 | 2/11/2009 | 2/11/2009 2:19:46 PM | P | PASS |
|
|
dustin - please call for access Phone #: ###-####
|
BLD08-02354
| BLD-Framing/Rough-in | 2/10/2009 | 2/11/2009 | 2/11/2009 1:25:17 PM | A | PASS |
|
|
Phone ###-####
|