Inspections for the day of: Wednesday, February 11, 2009.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD08-01467 FIRE-Conference2/11/20092/11/20092/12/2009 1:28:59 PMPDONE
Contractor wanted to know if the security sensors would create an obstruction to the egress path. Tom and I told him that it did not appear that it would.
FIR08-00841 INSP-Sprinkler Rough-in2/10/20092/11/20092/11/2009 3:48:14 PMAPASS
Rough-in inspection passed. See the city approved plans for locations of corrections needed. The hard lid areas are ok to cover.
FIR08-00672 INSP-Sprinkler Rough-in/Hydro2/10/20092/11/20092/11/2009 3:42:39 PMAPART
Phases A and B inspected today. See the city approved plans for locations of corrections needed.
FIR09-00115 INSP-Sprinkler Rough-in2/10/20092/11/20092/11/2009 3:40:54 PMAPART
See the city approved plans for the hardlid areas that are ok to cover
FIR08-00815 INSP-Sprinkler Rough-in2/10/20092/11/20092/11/2009 12:42:41 PMAFAIL
See city approved plans for deffinices noted which include over spaced heads and inadequate tenting. Incorrect back flow preventer installed. No approval to cover piping at this time was given.
FIR08-00491 INSP-Sprinkler Rough-in/Hydro2/10/20092/11/20092/11/2009 12:38:45 PMAPASS
Underground flush passed. See city approved plans for locations of sidewalls in entrance pockets are ok to cover