ESC08-00899
| Random Inspection | 2/11/2009 | 2/11/2009 | 2/11/2009 3:45:23 PM | P | PASS |
|
|
|
BLD08-02205
| BLD-Framing/Rough-in | 2/10/2009 | 2/11/2009 | 2/11/2009 3:45:07 PM | P | PASS |
|
|
Jim Phone #: ###-####. 1st. floor, 2nd. layer 5/8 type x rock for 2hr. wall, both sides.
|
ESC08-00900
| Random Inspection | 2/11/2009 | 2/11/2009 | 2/11/2009 3:44:19 PM | P | PASS |
|
|
|
BLD08-02206
| BLD-Framing/Rough-in | 2/10/2009 | 2/11/2009 | 2/11/2009 3:44:06 PM | P | PASS |
|
|
Jim Phone #: ###-####. 1st. floor, 2nd. layer of 5/8 type x rock for 2hr. wall, both sides.
|
ESC08-00901
| Random Inspection | 2/11/2009 | 2/11/2009 | 2/11/2009 3:43:19 PM | P | PASS |
|
|
|
BLD08-02207
| BLD-Framing/Rough-in | 2/10/2009 | 2/11/2009 | 2/11/2009 3:43:05 PM | P | PASS |
|
|
Jim Phone #: ###-####. 1st. floor, 2nd. layer 5/8 typex rock for 2hr. wall both sides.
|
ESC08-00889
| Random Inspection | 2/11/2009 | 2/11/2009 | 2/11/2009 3:41:21 PM | P | PASS |
|
|
|
BLD08-02197
| BLD-Framing/Rough-in | 2/10/2009 | 2/11/2009 | 2/11/2009 3:41:04 PM | P | PASS |
|
|
Jim Phone #: ###-####. 1st. floor, 2nd. layer 5/8 type x rock for 2hr. wall, both sides.
|
ESC08-00890
| Random Inspection | 2/11/2009 | 2/11/2009 | 2/11/2009 3:40:09 PM | P | PASS |
|
|
|
BLD08-02198
| BLD-Framing/Rough-in | 2/10/2009 | 2/11/2009 | 2/11/2009 3:39:55 PM | P | PASS |
|
|
Jim Phone #: ###-####. 1st. floor, 2nd. layer 5/8 type x rock for 2hr. wall, both sides.
|
ESC08-00892
| Random Inspection | 2/11/2009 | 2/11/2009 | 2/11/2009 3:39:03 PM | P | PASS |
|
|
|
BLD08-02199
| BLD-Framing/Rough-in | 2/10/2009 | 2/11/2009 | 2/11/2009 3:38:40 PM | P | PASS |
|
|
Jim Phone #: ###-####. 1st. floor, 2nd layer 5/8 type x rock for 2hr. wall. both sides.
|
BLD08-02200
| BLD-Framing/Rough-in | 2/10/2009 | 2/11/2009 | 2/11/2009 3:37:53 PM | P | PASS |
|
|
Jim Phone #: ###-####. 1st.floor, 2nd layer 5/8 type x rock for 2hr. wall, both sides.
|
BLD08-01321
| BLD-Conference | 2/11/2009 | 2/11/2009 | 2/11/2009 2:59:43 PM | P | PART |
|
|
Inspected required structural upgrade, also inspected membrane and thruogh penetrations for 1hr. wall. Info from architect is incomplete, received design listings only no details. Called and left message with architect.
|
ESC08-00843
| Random Inspection | 2/11/2009 | 2/11/2009 | 2/11/2009 2:56:23 PM | P | PASS |
|
|
|
BLD08-02123
| BLD-Energy code compliance | 2/11/2009 | 2/11/2009 | 2/11/2009 2:55:52 PM | P | PASS |
|
|
jim Phone #: ###-####
|
BLD08-02205
| BLD-Framing/Rough-in | 2/10/2009 | 2/11/2009 | 2/11/2009 2:55:20 PM | A | PART |
|
|
Jim Phone #: ###-####. 1st. floor, tpe x rock for 2hr. wall, remaining side.
|
BLD08-02206
| BLD-Framing/Rough-in | 2/10/2009 | 2/11/2009 | 2/11/2009 2:54:27 PM | A | PART |
|
|
Jim Phone #: ###-####. 1st. floor, 5/8 type x rock for 2hr. wall remaining side.
|
BLD08-02207
| BLD-Framing/Rough-in | 2/10/2009 | 2/11/2009 | 2/11/2009 2:53:17 PM | A | PART |
|
|
Jim Phone #: ###-####. 1st floor, 5/8 type x rock for 2hr. wall, remaining side.
|
BLD08-02197
| BLD-Framing/Rough-in | 2/10/2009 | 2/11/2009 | 2/11/2009 2:48:01 PM | A | PART |
|
|
Jim Phone #: ###-####. 1st. floor, 5/8 type x rock for 2hr wall, remaining side.
|
BLD08-02198
| BLD-Framing/Rough-in | 2/10/2009 | 2/11/2009 | 2/11/2009 2:47:16 PM | A | PART |
|
|
Jim Phone #: ###-####. 1st.floor, 5/8 type x rock for 2hr. wall, remaining side.
|
BLD08-02199
| BLD-Framing/Rough-in | 2/10/2009 | 2/11/2009 | 2/11/2009 2:46:27 PM | A | PART |
|
|
Jim Phone #: ###-####. 1st. floor, 5/8 type x rock, for 2hr. wall remaining side.
|
BLD08-02123
| BLD-Framing/Rough-in | 2/10/2009 | 2/11/2009 | 2/11/2009 2:40:36 PM | A | PASS |
|
|
jim Phone #: ###-####. All issues resolved. ok to insul.
|
ESC08-00894
| Random Inspection | 2/11/2009 | 2/11/2009 | 2/11/2009 2:38:59 PM | A | PASS |
|
|
|
BLD08-02200
| BLD-Framing/Rough-in | 2/10/2009 | 2/11/2009 | 2/11/2009 2:38:45 PM | A | PART |
|
|
Jim Phone #: ###-####. 1st. floor, 5/8type x rock for 2hr wall, remaining side.
|
BLD08-01073
| BLD-Final | 2/11/2009 | 2/11/2009 | 2/11/2009 1:50:28 PM | P | PASS |
|
|
Les Phone #: ###-####
|
BLD08-01073
| DOC - Permit Finaled | 2/11/2009 | 2/11/2009 | 2/11/2009 1:50:19 PM | P | PASS |
|
|
Letter of compliance issued.
|
ESC08-00621
| Site Final | 2/11/2009 | 2/11/2009 | 2/11/2009 1:49:48 PM | P | PASS |
|
|
|
ESC08-00621
| DOC - Permit Finaled | 2/11/2009 | 2/11/2009 | 2/11/2009 1:49:37 PM | P | PASS |
|
|
ESC sign and BMP's have been removed. All soils have been stabalized. 70% reveg has been obtained.
|