FIR12-00255
| INSP-Final Inspection | 2/8/2013 | 2/11/2013 | 2/11/2013 5:07:02 PM | A | PART |
|
|
Items needed for final include; points map with accurate room numbers, correct addresses at SD 60 and 63, revise visual coverage at corridor 145- see red line review comments, install panel batteries per plans. ID and duct detectors not yet tested. Remainder of installation including riser supervision, notification, initiating, monitoring and panel items tested okay.
|
FIR12-00246
| INSP-Final Inspection | 2/11/2013 | 2/11/2013 | 2/11/2013 4:54:24 PM | P | PART |
|
|
Riser supervision tested satisfactory, low air switch adjusted while on site, forward flow completed.
|
FIR12-00580
| INSP-Final Inspection | 2/5/2013 | 2/11/2013 | 2/11/2013 4:49:15 PM | P | PASS |
|
|
Scope of fire alarm work finished and passed inspection. Permit finaled.
|
FIR12-00460
| INSP-Final Inspection | 2/11/2013 | 2/11/2013 | 2/11/2013 4:48:05 PM | P | PASS |
|
|
Hood suppression permit final approved.
|
FIR13-00056
| INSP-Sprinkler Rough-in | 2/11/2013 | 2/11/2013 | 2/11/2013 4:45:53 PM | A | PART |
|
|
Overhead work at the drop ceilings approved for cover. In rack sprinkler rough-in also completed okay.
|
BLD12-03263
| FIRE-Final Inspection | 2/6/2013 | 2/11/2013 | 2/11/2013 12:00:00 AM | A | CANC |
|
|
Allison-Please call prior to inspection Phone #: ###-####
|