Inspections for the day of: Tuesday, February 11, 2014.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD14-00051 FIRE-Final Inspection2/11/20142/11/20142/12/2014 10:53:59 AMPPASS
Fire life safety inspection passed.
BLD14-00229 FIRE-Final Inspection2/10/20142/11/20142/11/2014 5:02:25 PMPPASS
Life safety okay pending suite address and keyed hardware at the main entry/exit per review items 1 and 2. Structural inspection to verify prior to final as discussed.
BLD13-01691 FIRE-Final Inspection2/10/20142/11/20142/11/2014 4:38:03 PMPPART
Final pending relay to the fire alarm panel at the main entry/exit door mags, post max occupant signage at the meeting room.
FIR13-00315 INSP-Supply line flush2/11/20142/11/20142/11/2014 4:32:49 PMPNR
Pending water supply
BLD13-02311 FIRE-Final Inspection2/11/20142/11/20142/11/2014 4:32:00 PMPPASS
C/N items verified for completion. Fire life safety finaled.
BLD13-01783 FIRE-Final Inspection2/10/20142/11/20142/11/2014 4:22:43 PMAPASS
Fire life safety inspection passed after corrections and adjustments made while on site.
BLD13-01782 FIRE-Final Inspection2/10/20142/11/20142/11/2014 4:19:22 PMAPASS
Fire life safety walkthrough passed.
BLD11-01983 FIRE-Final Inspection2/11/20142/11/20142/11/2014 11:50:58 AMPPASS
FIR13-00404 INSP-Final Inspection2/10/20142/11/20142/11/2014 11:47:17 AMANR
Final pending trade related work.
FIR13-00638 INSP-Final Inspection2/10/20142/11/20142/11/2014 11:05:11 AMAPART
Rough-in work passed, final pending trade related permits and project finishes.
FIR13-00600 INSP-Final Inspection2/10/20142/11/20142/11/2014 10:13:41 AMAPASS
Fire sprinkler permit finaled.
FIR13-00692 INSP-Final Inspection2/10/20142/11/20142/11/2014 10:12:50 AMAPART
Fire sprinkler work passed overhead inspection. Final pending ceiling tile installation at the kitchen area grid.