MEC14-00100
| Final | 2/10/2014 | 2/11/2014 | 2/11/2014 5:08:25 PM | P | PEND |
|
|
garage code 8898 Phone #: ###-#### >> Inspection requested via web by Gary Reeves..i will talk to troy regarding this job before i do the final
|
GCM14-00026
| GCM-Rough In & Pressure Test | 2/10/2014 | 2/11/2014 | 2/11/2014 5:06:03 PM | P | FAIL |
|
|
###-#### Idaho Geothermal, New approved manual J on site...posted c/n and called the contractor
|
GCM14-00040
| GCM-Final | 2/10/2014 | 2/11/2014 | 2/11/2014 4:40:38 PM | P | PASS |
|
|
tenant ###-####, after 2:30
|
GCM14-00045
| GCM-Rough-in | 2/11/2014 | 2/11/2014 | 2/11/2014 4:34:59 PM | P | PASS |
|
|
Don or Clint, ###-#### or ###-####. Rough-in on fireplace..r/i and 20lb gas ok
|
MEC14-00553
| Final | 2/10/2014 | 2/11/2014 | 2/11/2014 3:55:30 PM | P | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by April Thomas
|
MEC14-00572
| Rough-in | 2/11/2014 | 2/11/2014 | 2/11/2014 3:27:48 PM | P | PASS |
|
|
>> Inspection requested via web by clay janes
|
MEC14-00578
| Final | 2/11/2014 | 2/11/2014 | 2/11/2014 2:33:37 PM | P | PASS |
|
|
Mid to late afternoon please. Thanks. Phone #: ###-#### >> Inspection requested via web by April Thomas
|
MEC14-00560
| Final | 2/10/2014 | 2/11/2014 | 2/11/2014 2:00:10 PM | P | PASS |
|
|
Adam w/TML is requesting around 2pm, please call before going, thank you Phone #: ###-#### >> Inspection requested via web by Michele LaMott
|
MEC14-00514
| Final | 2/10/2014 | 2/11/2014 | 2/11/2014 1:51:55 PM | P | PART |
|
|
installer sam 6317948 Phone #: ###-#### >> Inspection requested via web by Dustin Rich..flue test ok...final not ready
|
MEC14-00388
| Rough-in | 2/11/2014 | 2/11/2014 | 2/11/2014 1:21:01 PM | P | PASS |
|
|
Please call ###-#### with any questions. Phone #: ###-#### >> Inspection requested via web by Carrie Bracamonte
|
MEC14-00509
| Rough-in | 2/11/2014 | 2/11/2014 | 2/11/2014 1:20:01 PM | P | PASS |
|
|
As late in the afternoon as possible. Thanks. Phone #: ###-#### >> Inspection requested via web by April Thomas
|
MEC14-00576
| Final | 2/11/2014 | 2/11/2014 | 2/11/2014 1:09:09 PM | P | PASS |
|
|
As close to noon as possible, so you can use the guys ladder to get on the roof. Phone #: ###-#### >> Inspection requested via web by April Thomas
|
GCM14-00041
| GCM-Final | 2/5/2014 | 2/11/2014 | 2/11/2014 12:50:25 PM | P | PASS |
|
|
Contractor, Sam ###-####, Homeowner ###-####
|
MIS14-00026
| MEC-Conference | 2/10/2014 | 2/11/2014 | 2/11/2014 10:56:01 AM | A | PASS |
|
|
9:00 meet Bob Tikker ###-####..met with bob to discuss use of old type 1 hood
|
GCM14-00043
| GCM-Final | 2/10/2014 | 2/11/2014 | 2/11/2014 10:52:48 AM | A | PASS |
|
|
###-#### Dave
|
MEC13-04481
| Final | 2/11/2014 | 2/11/2014 | 2/11/2014 10:44:59 AM | A | PEND |
|
|
jesse..waiting on verification from other contractor
|
MEC14-00410
| Final | 2/10/2014 | 2/11/2014 | 2/11/2014 9:56:53 AM | A | PEND |
|
|
Thanks Please call when completed Thanks Joe Phone #: ###-#### >> Inspection requested via web by Jose Rodriguez..waiting for inspection from troy
|
MEC14-00514
| Pressure Test | 2/10/2014 | 2/11/2014 | 2/11/2014 9:34:23 AM | A | NR |
|
|
p/t is for flue installer sam ###-#### Phone #: ###-#### >> Inspection requested via web by Dustin Rich..will do in the pm
|
MEC14-00410
| Rough-in | 2/10/2014 | 2/11/2014 | 2/11/2014 9:25:43 AM | A | PASS |
|
|
Thanks Plese call when completed. Thanks Joe Phone #: ###-#### >> Inspection requested via web by Jose Rodriguez..ok for ceiling tile in kitchen
|
MEC14-00514
| Pressure Test | 2/6/2014 | 2/11/2014 | 2/10/2014 8:40:27 AM | P | CANC |
|
|
pressure test is for flue Jarod installer ###-#### Phone #: ###-#### >> Inspection requested via web by Dustin Rich Inspection cancelled from web by: Dustin Rich
|