ESC13-01129
| DOC - Permit Finaled | 2/11/2014 | 2/11/2014 | 2/11/2014 4:07:04 PM | P | PASS |
|
|
House has been demolished. Now parcel is covered under new permit for new SFH. See ESC14-00097
|
ESC13-00524
| Random Inspection | 2/11/2014 | 2/11/2014 | 2/11/2014 12:22:40 PM | P | FAIL |
|
|
Central Pavement on-site making corrections at time of inspection. Rill erosion and sediment loading onto streets within Hackberry Ranch. Water is pooling on flat area but does not infiltrate quickly enough to reduce pressure on earthen berms which created some blow outs.
Recommended placing gravel check dams at openings to berms and laying down straw to reduce impact of rain and slow down runoff.
|
ESC13-00683
| General Inspection | 2/11/2014 | 2/11/2014 | 2/11/2014 11:50:28 AM | | PASS |
|
|
Finaled.
|
ESC13-00683
| DOC - Permit Finaled | 2/11/2014 | 2/11/2014 | 2/11/2014 11:48:21 AM | P | PASS |
|
|
Remodel/addition is complete. Construction area has been stabilized. No further ESC inspection necessary.
|
ESC13-00755
| Tracking Control | 2/11/2014 | 2/11/2014 | 2/11/2014 11:42:45 AM | P | PART |
|
|
Verbal correction notice to RP Preston. Need to clean up Terraces project related trackout on roundabout in between site and laydown area and restore construction entrance as necessary. Rest of site BMPs are in good condition.
|
ESC12-00539
| General Inspection | 2/11/2014 | 2/11/2014 | 2/11/2014 11:31:22 AM | | PASS |
|
|
No blowouts or failures in area. Hunter Homes keeping individual projects clean.
|
ESC13-00969
| Site Preparation | 2/11/2014 | 2/11/2014 | 2/11/2014 11:23:55 AM | P | PASS |
|
|
Clint Phone #: ###-####
Berms between lots keeping sediment on block. Alley is clean; washout has remaing capacity. Permit has been posted. Approved for excavation.
|
ESC13-01279
| Tracking Control | 2/11/2014 | 2/11/2014 | 2/11/2014 11:16:24 AM | P | FAIL |
|
|
Excessive track out or spill of dirt/mud onto Eckhart. Will need extra sweeping/scraping at the end of the day. The construction entrance was enhanced but it still appears to be failing.
Issued verbal correction notice to RP. Second trackout warning/issue at site.
|
ESC13-00259
| Random Inspection | 2/11/2014 | 2/11/2014 | 2/11/2014 10:55:29 AM | A | PASS |
|
|
Hillside inspection. Stabilization and BMPs installed are preventing erosion and trackout to Millet. No large rills or other issues observed. Approved.
|
ESC13-00952
| Random Inspection | 2/11/2014 | 2/11/2014 | 2/11/2014 10:43:51 AM | A | PASS |
|
|
Flat lot in Promotory Ridge. House is built, yard is not yet landscaped. Sidewalks and street are clean. Permit is posted. No prior inspections for this permit.
|
ESC13-00665
| General Inspection | 2/11/2014 | 2/11/2014 | 2/11/2014 10:41:05 AM | | PASS |
|
|
House nearly complete. Driveway is poured. Yard needs landscaping/stabilization. No trackout or other violations observed.
|
ESC13-00546
| General Inspection | 2/11/2014 | 2/11/2014 | 2/11/2014 10:30:44 AM | | PASS |
|
|
Interior work ongoing. Surround by concrete so no stabilization is necessary. Can be closed with BLD permit. No violations observed.
|
ESC13-00840
| Random Inspection | 2/11/2014 | 2/11/2014 | 2/11/2014 10:20:04 AM | A | PASS |
|
|
Permits posted. Perimeter wattles in place. No trackout onto Century Way. Site grading and drainage under ESC13-00967. Entrances have been paved but more grading remains. No corrections at this time.
|
ESC13-00886
| Random Inspection | 2/11/2014 | 2/11/2014 | 2/11/2014 9:28:48 AM | P | PASS |
|
|
Road construction is finished and in use. Shoulders have been hydro-mulched, all equipment and material has been reomved from staging. Will keep ESC permit open to monitor stabilization in progress. BLD has not been finaled.
|
ESC13-00537
| Random Inspection | 2/11/2014 | 2/11/2014 | 2/11/2014 9:23:54 AM | P | PASS |
|
|
Vertical construction of phosphorus plant is ongoing with crane on-site and cement work. Two large lined washout pits have been set up to the west of the building. No trackout; silt fence perimeter still in place. Approved.
|
ESC12-00147
| General Inspection | 2/11/2014 | 2/11/2014 | 2/11/2014 9:18:03 AM | | PASS |
|
|
Finaled. See notes.
|
ESC12-00147
| DOC - Permit Finaled | 2/11/2014 | 2/11/2014 | 2/11/2014 9:17:42 AM | P | PASS |
|
|
Construction is complete on UV treatment plant. BLD permit final to be requested by contractor. All construction materials have been removed from staging. ESC conditions satisfied.
|
ESC12-00023
| General Inspection | 2/11/2014 | 2/11/2014 | 2/11/2014 8:53:22 AM | | PASS |
|
|
|
ESC13-00643
| General Inspection | 2/11/2014 | 2/11/2014 | 2/11/2014 8:25:01 AM | | PASS |
|
|
|