BLD13-00182
| BLD-Energy code compliance | 2/10/2015 | 2/11/2015 | 2/11/2015 2:15:57 PM | A | DEFR |
|
|
First floor of E building // Gary Phone #: ###-####
|
BLD13-03405
| BLD-Wall cover | 2/10/2015 | 2/11/2015 | 2/11/2015 2:15:31 PM | A | PASS |
|
|
3rd floor tower 2 framing/rough-in Phone #: ###-#### Inspection requested via web by Tim Toups ok to insulate exterior walls only/ exterior sheer nailling north wall. 5 th floor damper ok to instal gyp ceilling tower 1#
|
BLD14-00681
| BLD-Framing/Rough-in | 2/10/2015 | 2/11/2015 | 2/11/2015 12:28:59 PM | A | PASS |
|
|
Jose Phone #: ###-#### 4th floor sec 1 exterior walls ok to insulate
|