Inspections for the day of: Wednesday, February 11, 2015.
Number of inspections: 11
Percentage of inspections complete: 73 %
Percentage of inspections not complete: 27 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR14-00870 INSP-Final Inspection2/5/20152/10/2015 P 
Forrest, The school district would like to schedule the test for 3:30 on Tuesday if at all possible. Please let me know as soon as possible if that will work so I can confirm it with them. Thank you. Jason ###-#### Phone #: ###-#### >> Inspection requested via web by Jason Minnick
FIR14-00708 INSP-Sprinkler Rough-in2/10/20152/10/2015 P 
Rough to cover 2nd floor F. ###-#### Phone #: ###-#### >> Inspection requested via web by Scott Carter II
FIR14-00681 INSP-Sprinkler Rough-in/Hydro2/10/20152/10/2015 P 
Partial rough to cover bldg D 1st floor (soffits/hard lids ) ###-#### Leroy >> Inspection requested via web by Scott Carter II
FIR15-00086 INSP-Sprinkler Rough-in2/11/20152/11/20152/12/2015 4:01:56 PMPPART
Rough-in for branchlines to new pendent heads in the cloud ceiling okayed- drops and ceiling are not yet installed. Verified upright coverage at the seating areas and pendent heads in the kitchen grid ceilings.
FIR14-00889 INSP-Sprinkler Rough-in/Hydro2/10/20152/11/20152/12/2015 3:59:20 PMPPART
Concluded satisfactory pneumatic test of the dry system with no pressure loss at the guage.
BLD14-03212 FIRE-Final Inspection2/11/20152/11/20152/11/2015 3:02:49 PMPPASS
Life safety inspection passed.
FIR14-00801 INSP-Sprinkler Rough-in2/11/20152/11/20152/11/2015 2:13:01 PMPPART
Overhead work approved for cover, tenting and insulation install verified.
FIR14-00781 INSP-Final Inspection2/5/20152/11/20152/11/2015 11:40:00 AMAPART
Functional testing completed satisfactory. Items needed prior to final include; replace damaged HD at the panel enclosure, provide knox box per plan review note #9, remove "local alarm only" signage at the manual pull stations.
BLD14-02338 FIRE-Final Inspection2/10/20152/11/20152/11/2015 11:33:12 AMAPASS
Scope of work completed
FIR14-00477 INSP-Sprinkler Rough-in2/10/20152/11/20152/11/2015 8:30:00 AMPCANC
UG/Hydro. Jeff C is your contact. Please call 1/2 hour prior to inspection. Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
FIR14-00477 INSP-Sprinkler Rough-in2/10/20152/11/20152/10/2015 1:31:03 PMPCANC
UG/Flush inspection. Jeff C is your contact. Please call 1/2 hour prior to inspection. Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus