BLD14-00202
| BLD-Final | 2/9/2015 | 2/11/2015 | 2/11/2015 3:20:53 PM | P | NR |
|
|
Change of day per Charlie 2-10-15 blh Phone #: ###-####. Needs public works and zoning finals.
|
BLD14-01910
| BLD-Energy code compliance | 2/11/2015 | 2/11/2015 | 2/11/2015 2:13:05 PM | P | PASS |
|
|
Charlie Phone #: ###-####
|
BLD15-00209
| BLD-Ceiling Grid Inspection | 2/11/2015 | 2/11/2015 | 2/11/2015 1:24:29 PM | P | PART |
|
|
Ron Phone #: ###-####. Pending fire sprinkler rough in inspection.
|
BLD15-00081
| BLD-Final | 2/10/2015 | 2/11/2015 | 2/11/2015 11:51:16 AM | A | FAIL |
|
|
Call 20 mins before // Kings Phone #: ###-####. Repair the panic hardware on the south east exit.
|
BLD14-02350
| BLD-Footing | 2/10/2015 | 2/11/2015 | 2/11/2015 11:30:47 AM | A | PASS |
|
|
Jim-would like mid morning if poss Phone #: ###-####. column pad footings for mezz, footing for loading dock retaining walls.
|
BLD13-03602
| BLD-Framing/Rough-in | 2/10/2015 | 2/11/2015 | 2/11/2015 8:54:58 AM | A | PASS |
|
|
Tyler-would like 9:00 if poss Phone #: ###-####
|
BLD15-00081
| BLD-Conference | 2/10/2015 | 2/11/2015 | 2/11/2015 12:00:00 AM | A | CANC |
|
|
should be a final not conference blh // Kings Phone #: ###-####
|