Inspections for the day of: Thursday, February 11, 2016.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
GCB15-00077 GCB-Final2/10/20162/11/20162/11/2016 4:32:25 PMPPASS
Dante ###-####
BLD16-00140 BLD-Foundation2/11/20162/11/20162/11/2016 3:38:24 PMPPASS
Wall // Pat Phone #: ###-####
BLD15-04022 BLD-Energy code compliance2/10/20162/11/20162/11/2016 3:06:56 PMPPASS
Jeff Phone #: ###-####
BLD15-00810 BLD-Final2/11/20162/11/20162/11/2016 2:22:41 PMPPASS
BLD15-00810 DOC - Permit Finaled2/11/20162/11/20162/11/2016 2:22:23 PMPPASS
BLD15-04202 BLD-Final2/11/20162/11/20162/11/2016 2:17:16 PMPPASS
would like call ahead; Don Phone #: ###-####
BLD15-04202 DOC - Permit Finaled2/11/20162/11/20162/11/2016 2:17:02 PMPPASS
MIS16-00037 BLD-Conference2/11/20162/11/20162/11/2016 2:16:37 PMPDONE
possible addition (rear) without permit
Building rock veneer wall at stairway guard and walls and roof for a room attached to side of coach. Correction notice.......Building permit required. Contact PDS dept.
GCB15-00095 GCB-Framing2/11/20162/11/20162/11/2016 2:16:37 PMPPASS
Gary ###-####
Frame and Shear panel exterior nailing......OK.
BLD15-01780 BLD-Framing/Rough-in2/10/20162/11/20162/11/2016 11:37:33 AMAPART
Bill Phone #: ###-####
Framing on wash bay and canopy on wash bay....OK
BLD15-04007 BLD-Energy code compliance2/10/20162/11/20162/11/2016 11:07:27 AMAPASS
Clarence Phone #: ###-####
BLD16-00154 BLD-Framing/Rough-in2/10/20162/11/20162/11/2016 10:12:40 AMAPASS
Chris Phone #: ###-####
Shear and frame.....OK.
BLD15-03706 BLD-Framing/Rough-in2/10/20162/11/20162/11/2016 9:51:35 AMAPASS
BLD15-04274 BLD-Foundation2/10/20162/11/20162/11/2016 9:50:42 AMAPASS
stem wall; Lane Phone #: ###-####