GCB15-00077
| GCB-Final | 2/10/2016 | 2/11/2016 | 2/11/2016 4:32:25 PM | P | PASS |
|
|
Dante ###-####
|
BLD16-00140
| BLD-Foundation | 2/11/2016 | 2/11/2016 | 2/11/2016 3:38:24 PM | P | PASS |
|
|
Wall // Pat Phone #: ###-####
|
BLD15-04022
| BLD-Energy code compliance | 2/10/2016 | 2/11/2016 | 2/11/2016 3:06:56 PM | P | PASS |
|
|
Jeff Phone #: ###-####
|
BLD15-00810
| BLD-Final | 2/11/2016 | 2/11/2016 | 2/11/2016 2:22:41 PM | P | PASS |
|
|
|
BLD15-00810
| DOC - Permit Finaled | 2/11/2016 | 2/11/2016 | 2/11/2016 2:22:23 PM | P | PASS |
|
|
|
BLD15-04202
| BLD-Final | 2/11/2016 | 2/11/2016 | 2/11/2016 2:17:16 PM | P | PASS |
|
|
would like call ahead; Don Phone #: ###-####
|
BLD15-04202
| DOC - Permit Finaled | 2/11/2016 | 2/11/2016 | 2/11/2016 2:17:02 PM | P | PASS |
|
|
|
MIS16-00037
| BLD-Conference | 2/11/2016 | 2/11/2016 | 2/11/2016 2:16:37 PM | P | DONE |
|
|
possible addition (rear) without permit Building rock veneer wall at stairway guard and walls and roof for a room attached to side of coach. Correction notice.......Building permit required. Contact PDS dept.
|
GCB15-00095
| GCB-Framing | 2/11/2016 | 2/11/2016 | 2/11/2016 2:16:37 PM | P | PASS |
|
|
Gary ###-#### Frame and Shear panel exterior nailing......OK.
|
BLD15-01780
| BLD-Framing/Rough-in | 2/10/2016 | 2/11/2016 | 2/11/2016 11:37:33 AM | A | PART |
|
|
Bill Phone #: ###-#### Framing on wash bay and canopy on wash bay....OK
|
BLD15-04007
| BLD-Energy code compliance | 2/10/2016 | 2/11/2016 | 2/11/2016 11:07:27 AM | A | PASS |
|
|
Clarence Phone #: ###-####
|
BLD16-00154
| BLD-Framing/Rough-in | 2/10/2016 | 2/11/2016 | 2/11/2016 10:12:40 AM | A | PASS |
|
|
Chris Phone #: ###-#### Shear and frame.....OK.
|
BLD15-03706
| BLD-Framing/Rough-in | 2/10/2016 | 2/11/2016 | 2/11/2016 9:51:35 AM | A | PASS |
|
|
|
BLD15-04274
| BLD-Foundation | 2/10/2016 | 2/11/2016 | 2/11/2016 9:50:42 AM | A | PASS |
|
|
stem wall; Lane Phone #: ###-####
|