Inspections for the day of: Thursday, February 11, 2016.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD15-04028 BLD-Framing/Rough-in2/10/20162/11/20162/11/2016 5:18:47 PMPNR
Phone #: ###-#### Inspection requested via web by Joshua Keyes. Needs plumbing rough in inspection.
BLD15-04058 BLD-Energy code compliance2/11/20162/11/20162/11/2016 3:10:26 PMPPASS
Brett Phone #: ###-####
BLD15-04351 BLD-Wall Bracing2/11/20162/11/20162/11/2016 2:20:25 PMPNR
Zayne Phone #: ###-####
BLD15-04098 BLD-Final2/11/20162/11/20162/11/2016 2:02:26 PMPPASS
Shane Phone #: ###-####. Ok for perm occ.
BLD14-03071 BLD-Footing2/11/20162/11/20162/11/2016 1:33:46 PMPPASS
Manuel Phone #: ###-####. Permiter footings only.
BLD15-03489 BLD-Conference2/10/20162/11/20162/11/2016 10:30:15 AMADEFR
FS footings and continuous exterior footings Grid line A 4-6.5; Exterior continuous footings. Grid line H 4-6.5 Concrete scheduled 8am SI has already reviewed rebar and is scheduled onsite for tomorrows pour. Phone #: ###-#### Inspection requested via web by Jim Williams. Special inspection has approved. Concrete placement in progress. Special inspector on site.
BLD14-02173 BLD-Framing/Rough-in2/10/20162/11/20162/11/2016 9:50:59 AMAPASS
John Phone #: ###-####. South East Interior steel stud framed wall at annex, 2nd floor. All per supplied emgineering. Contractor to verify if clips are nedded or not on the horizontal stiffeners that are placed at 6ft. o.c. Supplied engineering does not show connections to studs.
BLD15-00245 BLD-Final2/10/20162/11/20162/11/2016 8:46:49 AMAPART
Cody Phone #: ###-####. Will be ok for perm occ. once zoning signs perm.