ELE17-03649
| ELE-Aging Inspection | 2/11/2020 | 2/11/2020 | 2/12/2020 5:25:46 AM | | DONE |
|
|
Doc-expire. No work was done at this address as per Lee Electric
|
ELE20-00489
| Rough-In Permanent Service | 2/11/2020 | 2/11/2020 | 2/11/2020 2:21:17 PM | P | PASS |
|
|
Please inspect the ground work from garage into basement. Phone #: ###-#### Inspection requested via web by John Harvey Ok cover ground work
|
ELE20-00144
| Electrical Rough-In | 2/11/2020 | 2/11/2020 | 2/11/2020 1:33:30 PM | P | DONE |
|
|
Talked to contractor about doing 1 final at end of remodel. Basement area is being remodeled in 2 to 3 stages. Talked to Daryl DeGrange about calling in for a few rough in inspections and 1 final at the end to save homeowner 2 to 3 seperate permit fees. This RI was preveiously inspected by Tom Saunders. Will inspect 2nd area when RI is finished.
|
ELE20-00144
| Final | 2/10/2020 | 2/11/2020 | 2/11/2020 1:33:13 PM | A | CANC |
|
|
Jedd- homeowner will be home to show basement. Call for details. Thanks. Phone #: ###-#### Inspection requested via web by Dan Hilke Talked to contractor about doing a couple RI inspections and then a final at the end, This will save homeowner permit costs if contractor doesnt call in for seperate finals on 1 area, the basement.
|
ELE19-03112
| Final | 2/11/2020 | 2/11/2020 | 2/11/2020 12:50:31 PM | P | CANC |
|
|
House is open all day. Phone #: ###-#### Inspection requested via web by Shaun Kirkman Talked to Shaun, rescheduled for 2/12
|
ELE20-00472
| Electrical Rough-In | 2/11/2020 | 2/11/2020 | 2/11/2020 12:07:40 PM | P | FAIL |
|
|
1. Recept was added to kitchen countertop off circuit somewhere in the house because it is new 14ga wire. Needs to be on 20a circuit. 2.Upon final, tamper resistant recept needs installed for refer. I will need access behind refer to verify.
|
ELE20-00472
| Final | 2/10/2020 | 2/11/2020 | 2/11/2020 12:02:20 PM | P | CANC |
|
|
Corbin Metcalf ###-#### Phone #: ###-#### Inspection requested via web by Samatha Solberg 1. 14ga wire comes from another circuit in the house to power a kitchen countertop recept. Wire needs to be 12ga. 2. Upon final, recept needs to be tamper resistant for refer.
|
ELE20-00474
| Electrical Rough-In | 2/10/2020 | 2/11/2020 | 2/11/2020 11:11:21 AM | A | PASS |
|
|
Corbin ###-#### or Justin ###-#### Phone #: ###-#### Inspection requested via web by Samatha Solberg Ok cover 2 bathrooms
|
ELE17-02846
| ELE-Aging Inspection | 2/11/2020 | 2/11/2020 | 2/11/2020 10:20:48 AM | | DONE |
|
|
Talked to Clay on 2/11 about kitchen remodel. He is going to try and schedule a final.
|
ELE17-02318
| Final | 2/11/2020 | 2/11/2020 | 2/11/2020 10:16:45 AM | P | PASS |
|
|
Ok final. Labels present.
|
ELE19-03575
| Final | 2/11/2020 | 2/11/2020 | 2/11/2020 10:11:01 AM | A | CANC |
|
|
Please call ahead with a time frame. Phone #: ###-#### Inspection requested via web by BRS Permitting Rescheduled for 2/12 as per contractor
|
ELE19-03622
| Final | 2/10/2020 | 2/11/2020 | 2/11/2020 9:43:22 AM | A | PASS |
|
|
Back door to east building is open. Call with any questions-Thanks Phone #: ###-#### Inspection requested via web by mark hood Ok final.
|
ELE17-00919
| Final | 2/4/2020 | 2/11/2020 | 2/11/2020 9:43:02 AM | A | FAIL |
|
|
Working To Close Old Permit. Hot Tub Connection Phone #: ###-#### Inspection requested via web by Louis Keller Fence on N side of tub needs bonded.
|