FIR19-00785
| INSP-Sprinkler Rough-in | 2/10/2020 | 2/11/2020 | 2/11/2020 2:27:26 PM | P | PASS |
|
|
The updated drawings have been provided to me. The ok to cover in the areas previously noted stands.
Tanner Phone #: ###-####
|
FIR19-00790
| INSP-Sprinkler Rough-in/Hydro | 2/10/2020 | 2/11/2020 | 2/11/2020 2:26:09 PM | P | PASS |
|
|
The unnderground hydro test was witnessed. Phone #: ###-####
|
FIR19-00791
| INSP-Sprinkler Rough-in/Hydro | 2/10/2020 | 2/11/2020 | 2/11/2020 2:25:14 PM | P | PASS |
|
|
The underground hydro test was witnessed. Phone #: ###-####
|
BLD20-00103
| FIRE-Final Inspection | 2/11/2020 | 2/11/2020 | 2/11/2020 2:23:07 PM | P | PART |
|
|
A temp for life safety is ok per Joe Bruce until a permit has been issued/inspected/approved for the fire alarm system that has been installed.
Jay Phone #: ###-####
|
FIR19-00754
| INSP-Conference | 2/11/2020 | 2/11/2020 | 2/11/2020 12:26:29 PM | P | DONE |
|
|
I spoke to George about re-hydro testing due to the cplg change out.
|
FIR19-00816
| INSP-Sprinkler Rough-in | 2/10/2020 | 2/11/2020 | 2/11/2020 9:42:46 AM | A | CANC |
|
|
Cancel per James. Call James before heading out. Rough and tenting towers 1 ; 2 Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
FIR20-00089
| INSP-Sprinkler Rough-in | 2/10/2020 | 2/11/2020 | 2/11/2020 8:27:30 AM | A | PASS |
|
|
Rough-in passed. Piping is ok for cover.
Please call Cameron with your time frame so we can make sure the door is unlocked.
Thanks. Phone #: ###-#### Inspection requested via web by Jeff Packham
|