BLD95-02126
| INSP-Final Inspection | 2/10/1998 | 2/12/1998 | 2/12/1998 12:00:00 AM | A | PASS |
|
|
remaining issues from correction notice completed. occupancy approved.
|
BLD96-02798
| INSP-Sprinkler Rough-in/Hydro | 2/12/1998 | 2/12/1998 | 2/12/1998 12:00:00 AM | A | PART |
|
|
checked areas E,G and H. all okay, still need heads in some areas not getting tiles yet. areas between bathrooms not sprinklered, will recheck later if they are needed.
|
BLD97-00040
| INSP-Sprinkler Rough-in/Hydro | 2/11/1998 | 2/12/1998 | 2/12/1998 12:00:00 AM | P | PASS |
|
|
1st floor shell rough-in only. alarms still require test.
|
BLD97-03602
| INSP-Final Inspection | 2/12/1998 | 2/12/1998 | 2/12/1998 12:00:00 AM | P | PASS |
|
|
all corrections completed. occ approved.
|