BLD99-02185
| BLD-Final | 2/8/2001 | 2/12/2001 | 2/12/2001 12:00:00 AM | P | NR |
|
|
###-#### John
|
BLD00-03609
| BLD-Final | 2/9/2001 | 2/12/2001 | 2/12/2001 12:00:00 AM | P | PASS |
|
|
###-#### final ok 2/12/2001 3:01:05 PM
|
BLD99-03401
| BLD-Framing/Rough-in | 2/10/2001 | 2/12/2001 | 2/12/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 02/10/2001 at 11:11:44. Contact: ###-####. ok for l/c 2/12/2001 3:00:43 PM
|
BLD00-01867
| BLD-Framing/Rough-in | 2/10/2001 | 2/12/2001 | 2/12/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 02/10/2001 at 11:13:01. Contact: ###-####. conf. plan review iuse of permit scope of work. pending responce. 2/12/2001 3:02:08 PM
|
BLD00-01563
| BLD-Concrete | 2/12/2001 | 2/12/2001 | 2/12/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 02/12/2001 at 07:19:10. Contact: ###-####. placed with 2/12/2001 1:09:40 PM
|
BLD00-01797
| BLD-Framing/Rough-in | 2/12/2001 | 2/12/2001 | 2/12/2001 12:00:00 AM | P | PASS |
|
|
###-####
|
BLD00-01797
| BLD-Framing/Rough-in | 2/12/2001 | 2/12/2001 | 2/12/2001 12:00:00 AM | P | PASS |
|
|
###-####
|
BLD00-02920
| BLD-Framing/Rough-in | 2/12/2001 | 2/12/2001 | 2/12/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 301 On 2/12/2001 1:06:26 PM c2/27 stair beam must maintane 6ft 8 in. headroom will require engineering and resubmital for design.previous c/n idems ok pending 1. deflection of fab wall at beam for intagraty of assembly.
|
BLD00-02159
| BLD-Framing/Rough-in | 2/12/2001 | 2/12/2001 | 2/12/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 301 On 2/12/2001 1:02:44 PM c/n submital for colum protection, ele box protection < 24 spacing, pre rock for plumb pipe fire stopping at 17/d,e , wrap beam to maintain corrdor at 16,17/d,e.
|
BLD00-02920
| BLD-Framing/Rough-in | 2/12/2001 | 2/12/2001 | 2/12/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 301 On 2/12/2001 1:13:09 PM basement ok ro cover of walls rm# 001k,1l,1m,1n,0h,oc
|