BLD00-03572
| BLD-Energy code compliance | 2/9/2001 | 2/12/2001 | 2/12/2001 12:00:00 AM | A | PASS |
|
|
###-####ok to cover 2/12/2001 9:12:56 AM
|
BLD00-03311
| BLD-Framing/Rough-in | 2/9/2001 | 2/12/2001 | 2/12/2001 12:00:00 AM | A | NR |
|
|
FR INSP- BRIAN ###-#### Need plumbing and mechanical rough in sign offs plus air seal package prior to framing inspection. 2/12/2001 9:33:53 AM
|
BLD00-03599
| BLD-Framing/Rough-in | 2/12/2001 | 2/12/2001 | 2/12/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 02/12/2001 at 07:24:15. Contact: ###-####.ok to insulate. 2/12/2001 8:56:17 AM
|
MEC01-00022
| Final | 2/12/2001 | 2/12/2001 | 2/12/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by Inspector: 420 On 2/12/2001 10:07:51 AM
|
BLD01-00005
| BLD-Framing/Rough-in | 2/12/2001 | 2/12/2001 | 2/12/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 420 On 2/12/2001 12:40:39 PM Verified simpson struct connection--strap #dsc4
|
BLD00-03440
| BLD-Energy code compliance | 2/9/2001 | 2/12/2001 | 2/12/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 02/09/2001 at 09:23:12. Contact: . Ok to cover 2/12/2001 1:06:15 PM
|
BLD00-03651
| BLD-Energy code compliance | 2/12/2001 | 2/12/2001 | 2/12/2001 12:00:00 AM | P | PASS |
|
|
###-#### MEC Check report submitted--Ok. 2/12/2001 1:57:06 PM
|
BLD00-03601
| BLD-Framing/Rough-in | 2/12/2001 | 2/12/2001 | 2/12/2001 12:00:00 AM | P | CANC |
|
|
###-####: CANCELLED BY CONTRACTOR 2/12/2001 12:46:44 PM
|
BLD00-02496
| BLD-Final | 2/12/2001 | 2/12/2001 | 2/12/2001 12:00:00 AM | P | FAIL |
|
|
###-####--c/n issued--spindles on balcony railing exceed code tolerance, visqueen needed throughout in crawl and debris removed. 2/12/2001 1:49:48 PM
|
BLD00-02635
| BLD-Energy code compliance | 2/12/2001 | 2/12/2001 | 2/12/2001 12:00:00 AM | P | PASS |
|
|
###-####
|