BLD01-00234
| BLD-Framing/Rough-in | 2/11/2002 | 2/12/2002 | 2/12/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by Inspector: 340 On 2/11/2002 4:19:02 PM wendell 8668492,c/n: verify/justify glazed block at 2hr wall at ambulance bay at north ext; complete firestops, chk stair rails... 2/12/2002 6:17:26 PM
|
BLD00-02394
| BLD-Conference | 2/11/2002 | 2/12/2002 | 2/12/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by Inspector: 340 On 2/11/2002 4:19:42 PM ...met w/ Mike Cotner...need further statement by eng'r for struct upgrade. keep c/n2/12/2002 12:50:40 PM 2/12/2002 12:50:54 PM
|
BLD01-00539
| BLD-Framing/Rough-in | 2/11/2002 | 2/12/2002 | 2/12/2002 12:00:00 AM | A | PART |
|
|
###-#### firestop floors, clarify shaft penetration(hvac) 2/12/2002 12:51:36 PM
|
BLD00-03361
| BLD-Conference | 2/11/2002 | 2/12/2002 | 2/12/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by Inspector: 340 On 2/11/2002 2:33:20 PM ###-#### shell, need engs' affidavits; w/ BLD00-02375, add'l "shell" for concrete 2/12/2002 6:12:27 PM
|
BLD01-00602
| BLD-Framing/Rough-in | 2/11/2002 | 2/12/2002 | 2/12/2002 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 02/11/2002 at 15:15:52. Contact: ###-####.unable to contact 2/13/2002 3:38:13 PM
|
MEC01-01968
| Pressure Test | 2/12/2002 | 2/12/2002 | 2/12/2002 12:00:00 AM | P | NH |
|
|
Scheduled by a contractor via Hello! on 02/12/2002 at 10:08:10. Contact: ###-####.
|
BLD01-03277
| BLD-Conference | 2/12/2002 | 2/12/2002 | 2/12/2002 12:00:00 AM | P | PART |
|
|
###-#### RYAN call for frame insp 2/12/2002 6:04:35 PM
|
BLD00-02375
| BLD-Conference | 2/12/2002 | 2/12/2002 | 2/12/2002 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 2/12/2002 6:15:33 PM c/n issued, need spec insp/eng's affidavits....chk cracks at "irregular" beams at bsmt lid (profile changed...sleeved areas show cracking at bottom edges)
|
BLD00-00081
| BLD-Conference | 2/12/2002 | 2/12/2002 | 2/12/2002 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 2/12/2002 6:28:38 PM w/ Mike Cotner & supt re finals for west wing project...need eng's ok for MTI's observations & schmidt hammer tests
|
BLD01-01630
| BLD-Conference | 2/12/2002 | 2/12/2002 | 2/12/2002 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 2/12/2002 6:29:39 PM work postponed til north end completed
|
BLD00-03449
| BLD-Conference | 2/12/2002 | 2/12/2002 | 2/12/2002 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 2/12/2002 6:31:28 PM need affidavits, insp reports...all other agcy ok's for final
|