BLD01-00872
| BLD-Framing/Rough-in | 2/11/2002 | 2/12/2002 | 2/12/2002 12:00:00 AM | A | PART |
|
|
###-####. Needs truss ge1 at upper floor deck approved for bearing c/n posted. 2/12/2002 12:09:25 PM
|
BLD01-01951
| BLD-Final | 2/11/2002 | 2/12/2002 | 2/12/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 02/11/2002 at 14:13:31. Contact: ###-####. Needs all required signatures on job card, Still has bld corrections but would be ok for a temporary oc, when other agencies sign off. 2/12/2002 12:11:40 PM 2/12/2002 12:12:07 PM
|
BLD01-00877
| BLD-Foundation | 2/11/2002 | 2/12/2002 | 2/12/2002 12:00:00 AM | A | PASS |
|
|
NICK ###-####
|
BLD01-03169
| BLD-Wall cover | 2/12/2002 | 2/12/2002 | 2/12/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 02/12/2002 at 09:52:20. Contact: ###-####.
|
BLD01-00729
| BLD-Framing/Rough-in | 2/12/2002 | 2/12/2002 | 2/12/2002 12:00:00 AM | P | PART |
|
|
R/I RICH ###-#### See bld 01-00736 for notes. 2/12/2002 4:21:30 PM
|
BLD01-00737
| BLD-Framing/Rough-in | 2/12/2002 | 2/12/2002 | 2/12/2002 12:00:00 AM | P | NR |
|
|
Scheduled by Inspector: 407 On 2/12/2002 12:13:18 PM See bld01-00737 for notes. 2/12/2002 4:21:45 PM
|
BLD01-00736
| BLD-Framing/Rough-in | 2/12/2002 | 2/12/2002 | 2/12/2002 12:00:00 AM | P | PART |
|
|
Scheduled by Inspector: 407 On 2/12/2002 12:13:38 PM Need to complete shaer nailing in the last 6 rooms at far west end, Second floor shear is ok up to the first 2 hr wall from the east end. Note the 2 hr wall is not complete Ie fire stoping. A c/n is posted for areas that are approved for cover. 2/12/2002 4:21:12 PM
|