ELE06-03859
| Final | 2/12/2007 | 2/12/2007 | 2/12/2007 4:08:44 PM | P | CANC |
|
|
Key in garage light closet to door! Everything is fixed!!! Thank you!!!! Phone #: ###-#### corr made, ok to final
|
ELE06-04591
| Electrical Rough-In | 2/12/2007 | 2/12/2007 | 2/12/2007 3:00:05 PM | P | PART |
|
|
CONTACT: JOHN OSTOLASA - ROUGH IN PHASE II - CALL BEFORE GOING Phone #: ###-#### ok to cover walls only
|
ELE06-02453
| Electrical Rough-In | 2/12/2007 | 2/12/2007 | 2/12/2007 1:37:58 PM | P | PASS |
|
|
mike - addition ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith ric ok, will see again before cover ceiling
|
ELE07-00310
| Final | 2/12/2007 | 2/12/2007 | 2/12/2007 12:56:09 PM | P | FAIL |
|
|
chris ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith talked to service mgr and salesman, blower assy not listed as an ass'y by a nationally recognized testing lab. Control panel is listed for 3 options, but controlled items not listed.
|
ELE06-04225
| Permanent Service | 2/10/2007 | 2/12/2007 | 2/12/2007 10:59:04 AM | A | PASS |
|
|
Phone #: ###-#### corr made, p/s u/g n ok
|
ELE07-00467
| Electrical Rough-In | 2/9/2007 | 2/12/2007 | 2/12/2007 10:06:01 AM | A | NR |
|
|
curtis ###-#### wiring shall be per nec 517.13, contr shall re-do branch circuits to exam rooms
|
ELE07-00466
| Final | 2/9/2007 | 2/12/2007 | 2/12/2007 9:52:49 AM | A | PASS |
|
|
Ask for Dave, Building Maintenance Supervisor. he can provide you with access to job site. Work performed by Ron Chaney. Phone #: ###-#### ok to final
|
ELE07-00472
| Rough-In Permanent Service | 2/9/2007 | 2/12/2007 | 2/12/2007 9:31:30 AM | A | PASS |
|
|
brandon; Phone #: ###-#### Internet Inspection Request from: Victoria Beall ric ok, p/s u/g n ok
|
ELE07-00473
| Rough-In Permanent Service | 2/9/2007 | 2/12/2007 | 2/12/2007 9:30:57 AM | A | PASS |
|
|
brandon; Phone #: ###-#### Internet Inspection Request from: Victoria Beall ric ok, p/s u/g n ok
|
ELE07-00398
| Final | 2/9/2007 | 2/12/2007 | 2/12/2007 8:48:21 AM | A | PASS |
|
|
Phone #: ###-#### ok to final
|
ELE06-04352
| Final | 2/12/2007 | 2/12/2007 | 2/12/2007 8:34:14 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 2/12/2007 at 6:18:30 AM. Contact: ###-####. ok to final
|
ELE06-03859
| Final | 2/11/2007 | 2/12/2007 | 2/12/2007 8:08:25 AM | A | FAIL |
|
|
Please let Luke know if this doesn''t pass. Thank you very much, you guys are excellent! Phone #: ###-#### called, left message, nec 408.4 circuit directory shall be complete, 406.4 recpts shall be securely mounted, 210.8(A)(6) kitchen gfci shall be wired correctly, BCC hot and gnd reversed mbr, disposal shall be wired, rear bath gfci not working, garage gfci not working,upper west area shall have power
|
ELE06-02453
| Rough-In Permanent Service | 2/9/2007 | 2/12/2007 | 2/12/2007 12:00:00 AM | A | CANC |
|
|
mike-- ###-#### cell
|