BLD06-03160
| FIRE-Final Inspection | 2/11/2008 | 2/12/2008 | 2/12/2008 6:20:28 PM | P | FAIL |
|
|
A sprinkler head is installed in the storage room in an area where no ceiling is present. Per my conversation with Zane, I will follow up next week to see if the ceiling has been completed. If it is the fire life safety can be passed.
|
FIR07-00934
| INSP-Final Inspection | 2/12/2008 | 2/12/2008 | 2/12/2008 6:13:30 PM | P | FAIL |
|
|
Per ANSUL the nozzles in the ducting need approval from them prior to acceptance of the hood. The nozzles in the duct are installed at the top where as the installation guide and past installs the nozzles are installed at the bottom of the duct. Ken took pictures of the installation and will email them to his contact at ANSUL corporate. This was done to facilitate the approval of this permit for the fire suppression contractor and provide clarification to the inspectors.
|
FIR07-01033
| INSP-Final Inspection | 2/8/2008 | 2/12/2008 | 2/12/2008 6:08:44 PM | P | FAIL |
|
|
Could not complete the fire alarm due to the fire suppression permit.
|
FIR02-00287
| INSP-Final Inspection | 2/11/2008 | 2/12/2008 | 2/12/2008 3:12:24 PM | P | PASS |
|
|
Permit finaled. Fees have been paid per Marsha.
|
FIR08-00082
| INSP-Final Inspection | 2/12/2008 | 2/12/2008 | 2/12/2008 3:11:30 PM | P | PASS |
|
|
Permit finaled
|
FIR07-01013
| INSP-Sprinkler Rough-in/Hydro | 2/12/2008 | 2/12/2008 | 2/12/2008 3:11:04 PM | P | PASS |
|
|
The sprinkler piping is ok to cover. Per a verbal agreement with the general contractor the overbuild areas wont be covered until I can verify that they are full of insulation as per the approved plans.
|
FIR07-00886
| INSP-Sprinkler Rough-in/Hydro | 2/11/2008 | 2/12/2008 | 2/12/2008 11:38:28 AM | A | CANC |
|
|
Wrong permit number called in.
|
BLD07-01201
| FIRE-Final Inspection | 2/11/2008 | 2/12/2008 | 2/12/2008 11:04:36 AM | A | PART |
|
|
The insulation at address 10476 is complete and can be covered.
|
FIR08-00065
| INSP-Sprinkler Rough-in/Hydro | 2/11/2008 | 2/12/2008 | 2/12/2008 10:35:40 AM | A | FAIL |
|
|
There is no access to the project. No inspection was performed. A re-inspection fee has been applied.
|
BLD07-02358
| FIRE-Final Inspection | 2/11/2008 | 2/12/2008 | 2/12/2008 10:17:54 AM | A | PASS |
|
|
Life safety passed.
|
FIR06-00011
| INSP-Alarm Testing | 2/8/2008 | 2/12/2008 | 2/12/2008 10:04:28 AM | A | CANC |
|
|
To be rescheduled for tomorrow due to time constraints.
|
BLD05-00633
| FIRE-Final Inspection | 2/11/2008 | 2/12/2008 | 2/12/2008 10:03:45 AM | A | FAIL |
|
|
Todays inspection was for the 2ND floor south tower at the cafeteria. Two additional emergency lights are required as discussed in the corridor side of the cafeteria east exit
|