Inspections for the day of: Tuesday, February 12, 2008.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD03-01939 BLD-Conference2/12/20082/12/20082/12/2008 5:42:54 PMPCANC
BLD03-01939 DOC - Permit Expired2/12/20082/12/20082/12/2008 5:42:49 PMPPASS
Appears that work has been completed. No final inspection was schedule. Permit has expired.
BLD03-01967 BLD-Conference2/12/20082/12/20082/12/2008 4:05:56 PMPCANC
BLD03-01967 DOC - Permit Expired2/12/20082/12/20082/12/2008 4:05:50 PMPPASS
final inspection was never rescheduled. permit has expired.
BLD07-03074 BLD-Framing/Rough-in2/12/20082/12/20082/12/2008 3:27:41 PMPFAIL
matt Phone #: ###-####. No approved plans or notes on site. c/n posted. No frming insp. performed.
BLD03-01658 BLD-Conference2/12/20082/12/20082/12/2008 2:53:09 PMPCANC
BLD03-01658 DOC - Permit Expired2/12/20082/12/20082/12/2008 2:53:03 PMPPASS
Drove by house. Appears that work was never done. House is still single story.
BLD07-02208 BLD-Foundation2/12/20082/12/20082/12/2008 2:31:31 PMPPASS
dane Phone #: ###-####
BLD07-02184 BLD-Footing2/12/20082/12/20082/12/2008 2:31:14 PMPPART
dane Phone #: ###-####. wip. installing vert. steel.
BLD07-02954 BLD-Aging Inspection2/12/20082/12/20082/12/2008 11:49:09 AM NR
BLD06-00788 BLD-Conference2/11/20082/12/20082/12/2008 11:44:30 AMAPASS
Spoke with John Perkins regarding life/safety and bldg. finals. Gave Mr. Perkins permit number so that he could call finals in. Also noted to Mr. Perkins that approved plans would need to be on site. Mr. Perkins noted that he would locate approved plans and call in and schedule required final inspections.
BLD07-03198 BLD-Framing/Rough-in2/11/20082/12/20082/12/2008 11:02:12 AMAFAIL
Brandon Phone #: ###-####. Strap all top and bottom plates at gas pipe penetrations and at plumbing pentration at future warter softner. Provide header at doorway bonus room at T22 truss bearing. Tempered glazing required at window at landing. Provide fireblocking on furout 2x4 wall above 2x6 wall at ceiling level. (southwall). Provide additional bracing on gable truss on southwest wall by main entry. ok to insul. after mech. ri insp has passed. c/n posted on site.
BLD07-02835 BLD-Final2/8/20082/12/20082/12/2008 10:08:00 AMAPASS
David Phone #: ###-####. Letter of compliance issued.
BLD07-02835 DOC - Permit Finaled2/12/20082/12/20082/12/2008 10:07:37 AMPPASS
BLD08-00020 BLD-Framing/Rough-in2/11/20082/12/20082/12/2008 9:31:21 AMAPASS
gale Phone #: ###-####. Interior steel stud wall for new type 1 hood. ok to cover.