ESC07-01185
| Random Inspection | 2/11/2008 | 2/12/2008 | 2/12/2008 3:25:28 PM | P | PART |
|
|
Inspected with SGW. Instructed Contractor to install either silt fence or wattle per manufacturers specs. Also to ammend plans if silt fence is not going to be used. Will re-inspect on 2/15/08 at 12pm.
CAS SGW
|
ESC07-00611
| Random Inspection | 2/12/2008 | 2/12/2008 | 2/12/2008 10:16:56 AM | A | PART |
|
|
Discussed with Mike Warner over stock pile at end of project. Will be removed today. Also Mike informed me that new wattle will be installed today by the end of the day for sediment protection. Concrete washout is full and will be removed by the end of the day.
Clint Smith #460
|
ESC07-00819
| Random Inspection | 2/11/2008 | 2/12/2008 | 2/12/2008 9:17:35 AM | A | PART |
|
|
Driveway has been dressed with washed rock 2-3in rock. Permit isgn has been posted at the main entrance of project. Steve Meyers (Site super) went and recieved a temporary RP and will be taking the class on Wensday the 13th of Feb. 2008.
Discussed with RP that stock pile at the back of project must be stabilized since it has been dormit over 14 days. Washout pit needs to be dressed up with more plastic liner. Will re-inspect on 2/14/08 in the am.
|
ESC07-01185
| Site Preparation | 2/11/2008 | 2/12/2008 | 2/11/2008 3:58:01 PM | P | CANC |
|
|
Check out entrance and also BMP's
|