ELE09-00240
| Electrical Rough-In | 2/12/2009 | 2/12/2009 | 2/12/2009 2:20:41 PM | P | PASS |
|
|
PLease call for access information--John Phone #: ###-#### r/i wrok was fished in except for kit island
|
ELE08-02274
| Final | 2/12/2009 | 2/12/2009 | 2/12/2009 1:10:53 PM | P | FAIL |
|
|
kevin Phone #: ###-#### corr called 410.2&16 clearence all walkin closets M bed rms, 210.52(A&B) required outlet wall space fixed panel of slider
|
ELE09-00238
| Rough-In Permanent Service | 2/11/2009 | 2/12/2009 | 2/12/2009 11:40:54 AM | A | PASS |
|
|
Darren Phone #: ###-#### r/i ok, j tub listed p/s u/g new ok
|
ESC08-00999
| General Inspection | 2/12/2009 | 2/12/2009 | 2/12/2009 11:39:52 AM | A | PASS |
|
|
|
ELE09-00124
| Final | 2/11/2009 | 2/12/2009 | 2/12/2009 11:34:09 AM | A | PASS |
|
|
james Phone #: ###-#### ok no card
|
ELE09-00230
| Rough-In Permanent Service | 2/12/2009 | 2/12/2009 | 2/12/2009 10:03:09 AM | A | PASS |
|
|
r/i p/s u/g new ok
|
ELE09-00230
| Final | 2/12/2009 | 2/12/2009 | 2/12/2009 10:03:03 AM | A | PASS |
|
|
|
ELE09-00230
| Electrical Rough-In | 2/11/2009 | 2/12/2009 | 2/12/2009 9:59:28 AM | A | PASS |
|
|
Q#8231D75,#20084, We wired a new power pedestal and a new phone cabinet from this pedestal. Thanks, James. Phone #: ###-#### Internet Inspection Request from: Dan Mitchell
|
ELE08-03220
| Final | 2/11/2009 | 2/12/2009 | 2/12/2009 9:26:35 AM | A | PASS |
|
|
jeremy Phone #: ###-#### ok
|
ESC09-00030
| General Inspection | 2/12/2009 | 2/12/2009 | 2/12/2009 8:39:17 AM | A | PASS |
|
|
ok
|
ELE09-00235
| Electrical Rough-In | 2/11/2009 | 2/12/2009 | 2/12/2009 8:38:41 AM | A | PART |
|
|
Phone #: ###-#### Internet Inspection Request from: Don Lustig r/i ok contr will be installing outlet for wall space when cabinets are built
|
ELE08-03065
| Final | 2/11/2009 | 2/12/2009 | 2/12/2009 8:05:06 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 2/11/2009 at 4:31:00 PM. Contact: ###-####. ok card signed
|