Inspections for the day of: Thursday, February 12, 2009.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD08-01951 FIRE-Final Inspection2/12/20092/12/20092/17/2009 8:06:17 AMPPASS
Fire life safety inspection passed.
BLD08-02487 FIRE-Final Inspection2/12/20092/12/20092/13/2009 12:52:26 PMPNR
Pending project related fire sprinkler permit work.
FIR08-00103 INSP-Alarm Testing2/11/20092/12/20092/12/2009 4:39:45 PMAPART
Discussed plan resubmittals due to modifications including 13 added SD for dampers in the common corridors, added heat and smoke detectors in the elevator hoistway, relay for the mag locks at the main lobby doors, changes in the matrix for unused CR at the elevator smoke doors. Walkthrough for the basement level parking garage completed-noted one overspaced area at a handicap accessible parking space. Discussed project inspection schedule, also need to provide list of signals recieved during pre-testing.
FIR08-00783 INSP-Final Inspection2/11/20092/12/20092/12/2009 4:34:57 PMAPASS
Fire alarm permit finaled.
FIR08-00766 INSP-Sprinkler Rough-in/Hydro2/12/20092/12/20092/12/2009 2:55:12 PMPNR
Missing thrust blocks, seismic clearance at the riser SW corner is not sufficient, bolts at mech. tees and 90's need coated and covered.
FIR07-00928 INSP-Sprinkler Rough-in/Hydro2/11/20092/12/20092/12/2009 2:01:46 PMAPART
6th floor overhead hydrostatic test passed.
BLD09-00005 FIRE-Final Inspection2/11/20092/12/20092/12/2009 2:00:10 PMAPASS
Fire life safety final inspection passed.
BLD08-01099 FIRE-Final Inspection2/11/20092/12/20092/12/2009 11:49:06 AMAPASS
Life safety finaled.
FIR08-00815 INSP-Sprinkler Rough-in/Hydro2/11/20092/12/20092/12/2009 11:48:33 AMAPART
Okay to cover overhead install with the exception of three locations including first floor water closet where tenting is inadequate for the sprinkler drop, head adjacent to the basement spiral stairway not yet installed, and an overspaced pendent head at a basement bedroom. Remainder of correction items noted on 2/11 repaired. Contractor to maintain adequate cold cavity protection throughout the attic spaces.