Inspections for the day of: Thursday, February 12, 2009.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD08-01467 FIRE-Conference2/12/20092/12/20092/12/2009 4:23:34 PMPDONE
The contractor had questions on the exit sign locations.
BLD07-03132 FIRE-Final Inspection2/11/20092/12/20092/12/2009 4:22:45 PMPPASS
Fire/Life Safety passed
BLD08-02555 FIRE-Final Inspection2/12/20092/12/20092/12/2009 12:54:12 PMPPASS
life safety passed.
FIR09-00105 INSP-Final Inspection2/11/20092/12/20092/12/2009 12:30:53 PMAPASS
permit finaled
BLD09-00125 FIRE-Final Inspection2/11/20092/12/20092/12/2009 12:13:58 PMAFAIL
Provide the building address, repair the exit sign at the main exit, remove the exit sign at the north exit as per the approved drawings, provide the missing sprinkler canopies and provide a fire extinguisher as discussed.
FIR08-00831 INSP-Sprinkler Rough-in/Hydro2/11/20092/12/20092/12/2009 11:29:05 AMAPASS
The B wing second floor corridor branchline piping rough-in passed. A separate cover inspection will be required once the insulation is installed.
FIR08-00672 INSP-Sprinkler Rough-in/Hydro2/11/20092/12/20092/12/2009 8:56:56 AMAPASS
The sprinkler rough-in passed and the piping can be covered. The items needing corrected will be verified at the final.
FIR08-00742 FIR-Aging Inspection2/12/20092/12/20092/12/2009 7:37:57 AM DONE
Per Mark with simplex grinnell this will be called in for inspection next week.