BLD08-01467
| FIRE-Conference | 2/12/2009 | 2/12/2009 | 2/12/2009 4:23:34 PM | P | DONE |
|
|
The contractor had questions on the exit sign locations.
|
BLD07-03132
| FIRE-Final Inspection | 2/11/2009 | 2/12/2009 | 2/12/2009 4:22:45 PM | P | PASS |
|
|
Fire/Life Safety passed
|
BLD08-02555
| FIRE-Final Inspection | 2/12/2009 | 2/12/2009 | 2/12/2009 12:54:12 PM | P | PASS |
|
|
life safety passed.
|
FIR09-00105
| INSP-Final Inspection | 2/11/2009 | 2/12/2009 | 2/12/2009 12:30:53 PM | A | PASS |
|
|
permit finaled
|
BLD09-00125
| FIRE-Final Inspection | 2/11/2009 | 2/12/2009 | 2/12/2009 12:13:58 PM | A | FAIL |
|
|
Provide the building address, repair the exit sign at the main exit, remove the exit sign at the north exit as per the approved drawings, provide the missing sprinkler canopies and provide a fire extinguisher as discussed.
|
FIR08-00831
| INSP-Sprinkler Rough-in/Hydro | 2/11/2009 | 2/12/2009 | 2/12/2009 11:29:05 AM | A | PASS |
|
|
The B wing second floor corridor branchline piping rough-in passed. A separate cover inspection will be required once the insulation is installed.
|
FIR08-00672
| INSP-Sprinkler Rough-in/Hydro | 2/11/2009 | 2/12/2009 | 2/12/2009 8:56:56 AM | A | PASS |
|
|
The sprinkler rough-in passed and the piping can be covered. The items needing corrected will be verified at the final.
|
FIR08-00742
| FIR-Aging Inspection | 2/12/2009 | 2/12/2009 | 2/12/2009 7:37:57 AM | | DONE |
|
|
Per Mark with simplex grinnell this will be called in for inspection next week.
|