PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Thursday, February 12, 2009
.
Number of inspections:
9
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Clint A Smith
Title
EROSION CONTROL INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC08-00532
General Inspection
2/5/2009
2/12/2009
2/12/2009 8:54:08 PM
A
FAIL
Verbal to super due to RP on vacation:
Clean up the rest of the trash debris on site and surrounding the blue Allied Waste 40 yrd bin and place into the trash container. Wil re-inspect 2/13/09 AM.
ESC07-00359
General Inspection
2/12/2009
2/12/2009
2/12/2009 4:17:03 PM
P
PART
Went over with the RP pertaining with stabilization. Since his sud-division will be inactive for a large duration that by NPDES CGP, all areas of a project that is inactive for 14 days more must be temporariy or permanently stabilized. Will be scheduling for stabilizing within the week. Will re-inspect in the near future.
ESC08-00991
Random Inspection
2/12/2009
2/12/2009
2/12/2009 2:58:36 PM
P
FAIL
Verbal correction to RP:
1. Containerize all trash debris being stockpiled with the staging area.
2. Protect opening to the irragation 10" colverts that feed into the irragation canal.
Will re-inspect on 2/13/09 PM.
ESC08-00491
Tracking Control
2/9/2009
2/12/2009
2/12/2009 2:41:26 PM
P
CANC
Moved to 2/13/09 PM.
ESC08-00143
BMP Violation
2/4/2009
2/12/2009
2/12/2009 2:40:57 PM
A
FAIL
Due to weather conditions, the issues will be addressed in the spring time.
ESC03-00719
Site Final
2/12/2009
2/12/2009
2/12/2009 2:39:13 PM
P
PASS
ESC08-00994
Random Inspection
2/12/2009
2/12/2009
2/12/2009 2:21:28 PM
P
PASS
ESC08-00996
Random Inspection
2/12/2009
2/12/2009
2/12/2009 2:21:10 PM
P
PASS
ESC08-00999
Conference
2/11/2009
2/12/2009
2/12/2009 11:38:00 AM
A
DONE