Inspections for the day of: Friday, February 12, 2010.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR09-00642 INSP-Sprinkler Rough-in2/12/20102/12/20102/19/2010 3:20:24 PMPPART
On site visit regarding fire sprinkler coverage at the new restroom entry vestibules and concealed spaces. Included site walkthrough of building additions, dock areas, new wet riser and FDC at the east side. Discussed existing system and hydrostatic testing schedule.
FIR09-00650 FIR-Aging Inspection2/12/20102/12/20102/12/2010 3:34:18 PM DONE
In progress
BLD09-00287 FIRE-Final Inspection2/11/20102/12/20102/12/2010 3:33:04 PMAFAIL
Missing one EM light at the east exit discharge per plans, EM light at the south exit disharge is not functional, stairway lacks min. foot candle lighting per IFC requirements. Remainder of fire life safety issues and C/N items are satisfactory.
BLD09-00290 FIRE-Final Inspection2/11/20102/12/20102/12/2010 3:28:46 PMAPASS
Life safety passed.
BLD09-00291 FIRE-Final Inspection2/11/20102/12/20102/12/2010 3:27:56 PMAPASS
Life safety inspection passed.
FIR09-00535 INSP-Sprinkler Rough-in/Hydro2/12/20102/12/20102/12/2010 3:26:55 PMPPART
New overhead fire sprinkler system piping passed hydrostatic testing downstream of the riser control valve.
FIR09-00536 INSP-Sprinkler Rough-in2/11/20102/12/20102/12/2010 3:24:37 PMAPART
Rough-in inspection for the attic dry system completed satisfactory, main tie-ins are not yet finished, discussed seismic bracing, overhead piping at second floor stairways, insulation fill at the main entry vestibule okayed.
BLD10-00078 FIRE-Final Inspection2/11/20102/12/20102/12/2010 11:56:17 AMAPASS
Correction notice items field verified for completion, fire life safety inspection passed.