FIR09-00642
| INSP-Sprinkler Rough-in | 2/12/2010 | 2/12/2010 | 2/19/2010 3:20:24 PM | P | PART |
|
|
On site visit regarding fire sprinkler coverage at the new restroom entry vestibules and concealed spaces. Included site walkthrough of building additions, dock areas, new wet riser and FDC at the east side. Discussed existing system and hydrostatic testing schedule.
|
FIR09-00650
| FIR-Aging Inspection | 2/12/2010 | 2/12/2010 | 2/12/2010 3:34:18 PM | | DONE |
|
|
In progress
|
BLD09-00287
| FIRE-Final Inspection | 2/11/2010 | 2/12/2010 | 2/12/2010 3:33:04 PM | A | FAIL |
|
|
Missing one EM light at the east exit discharge per plans, EM light at the south exit disharge is not functional, stairway lacks min. foot candle lighting per IFC requirements. Remainder of fire life safety issues and C/N items are satisfactory.
|
BLD09-00290
| FIRE-Final Inspection | 2/11/2010 | 2/12/2010 | 2/12/2010 3:28:46 PM | A | PASS |
|
|
Life safety passed.
|
BLD09-00291
| FIRE-Final Inspection | 2/11/2010 | 2/12/2010 | 2/12/2010 3:27:56 PM | A | PASS |
|
|
Life safety inspection passed.
|
FIR09-00535
| INSP-Sprinkler Rough-in/Hydro | 2/12/2010 | 2/12/2010 | 2/12/2010 3:26:55 PM | P | PART |
|
|
New overhead fire sprinkler system piping passed hydrostatic testing downstream of the riser control valve.
|
FIR09-00536
| INSP-Sprinkler Rough-in | 2/11/2010 | 2/12/2010 | 2/12/2010 3:24:37 PM | A | PART |
|
|
Rough-in inspection for the attic dry system completed satisfactory, main tie-ins are not yet finished, discussed seismic bracing, overhead piping at second floor stairways, insulation fill at the main entry vestibule okayed.
|
BLD10-00078
| FIRE-Final Inspection | 2/11/2010 | 2/12/2010 | 2/12/2010 11:56:17 AM | A | PASS |
|
|
Correction notice items field verified for completion, fire life safety inspection passed.
|