Inspections for the day of: Friday, February 12, 2010.
Number of inspections: 28
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD09-02261 BLD-Final2/11/20102/12/20102/12/2010 4:59:02 PMPNR
Brian Phone #: ###-####. Mech. finaled failed.
BLD09-01608 BLD-Final2/12/20102/12/20102/12/2010 4:58:39 PMPPASS
Dave Phone #: ###-####
BLD09-01608 DOC - Permit Finaled2/12/20102/12/20102/12/2010 4:58:31 PMPPASS
All issues resolved. Cert. of compliance was issued.
ESC09-00668 Site Final2/12/20102/12/20102/12/2010 2:46:50 PMPPASS
ESC09-00668 DOC - Permit Finaled2/12/20102/12/20102/12/2010 2:46:41 PMPPASS
All work is completed. Site is clean.
BLD09-01866 BLD-Final2/12/20102/12/20102/12/2010 2:46:20 PMPPASS
Steve Phone #: ###-####. Ok for perm occ.
BLD09-00990 BLD-Final2/12/20102/12/20102/12/2010 2:00:11 PMPCANC
Inspection requested from web by: Mike Walling Phone #: ###-####
BLD09-01307 BLD-Final2/12/20102/12/20102/12/2010 1:58:59 PMPPASS
Inspection requested from web by: Mike Walling Phone #: ###-####. Ok for perm occ.
BLD09-01024 BLD-Final2/12/20102/12/20102/12/2010 1:58:14 PMPPASS
BLD09-01024 DOC - Permit Finaled2/12/20102/12/20102/12/2010 1:58:03 PMPPASS
Letter of compliance issued. Verified all other signatures.
ESC06-00563 Site Final2/12/20102/12/20102/12/2010 11:35:19 AMAPASS
ESC06-00563 DOC - Permit Finaled2/12/20102/12/20102/12/2010 11:35:09 AMPPASS
Final stabalization has been completed.
BLD06-00933 BLD-Final2/12/20102/12/20102/12/2010 11:34:31 AMAPASS
ok for perm occ. All other finals completed.
BLD06-00947 BLD-Final2/12/20102/12/20102/12/2010 11:05:02 AMAPASS
All other finals are done. Ok for perm occ.
BLD10-00071 BLD-Footing2/11/20102/12/20102/12/2010 10:54:17 AMAPASS
Todd Phone #: ###-####. Footings for balcony ok.
ESC10-00018 BMP Violation2/12/20102/12/20102/12/2010 10:53:47 AMAPASS
Issues were resolved. Contractor on site cleaning hardsurfaces at time of inspection.
ESC10-00050 Site Preparation2/12/20102/12/20102/12/2010 10:16:10 AMAPASS
ESC permit sign is posted. BMP;s and washout in place.
BLD10-00130 BLD-Footing2/11/20102/12/20102/12/2010 10:15:23 AMAPASS
Kevin Phone #: ###-####
ESC10-00023 Site Preparation2/12/20102/12/20102/12/2010 9:25:15 AM NR
BLD09-01306 BLD-Aging Inspection11/18/20092/12/20102/12/2010 9:24:53 AMACANC
BLD09-01306 DOC - Permit Expired2/12/20102/12/20102/12/2010 9:24:45 AMAPASS
ESC09-00757 Site Final2/12/20102/12/20102/12/2010 9:06:31 AMAPASS
ESC09-00757 DOC - Permit Finaled2/12/20102/12/20102/12/2010 9:06:22 AMPPASS
Final stabalization has been completed.
BLD09-02113 BLD-Final2/11/20102/12/20102/12/2010 9:05:53 AMAPASS
Eric-Please call for access information Phone #: ###-####
BLD09-02113 DOC - Permit Finaled2/12/20102/12/20102/12/2010 9:05:46 AMPPASS
Cert. of occ. was issued.
ESC09-00743 Site Final2/12/20102/12/20102/12/2010 8:47:07 AMAPASS
ESC09-00743 DOC - Permit Finaled2/12/20102/12/20102/12/2010 8:46:59 AMPPASS
Job completed. Job site is clean, BMP's removed.
BLD09-02071 BLD-Final2/10/20102/12/20102/12/2010 8:46:13 AMAPASS
JIm Phone #: ###-####. Ok for perm occ. Noted ope n mech. permit for gas piping. Called and left message with Lee Rice to final open permit, should be ok, was for pressure test.