FIR14-00023
| INSP-Sprinkler Rough-in | 2/12/2014 | 2/12/2014 | 2/12/2014 5:17:26 PM | P | PART |
|
|
Overhead fire sprinkler modifications passed rough-in inspection.
|
BLD12-01001
| FIRE-Final Inspection | 2/11/2014 | 2/12/2014 | 2/12/2014 5:14:06 PM | P | FAIL |
|
|
Project not in condition for final fire life safety approvals. Trade related work finals also pending.
|
FIR12-00639
| INSP-Final Inspection | 2/11/2014 | 2/12/2014 | 2/12/2014 5:05:09 PM | P | FAIL |
|
|
Missing trim and finishes at several locations, damaged SW head at the west stair 3rd floor, non-functional high/low air switch. Not ready for final.
|
FIR13-00315
| INSP-Sprinkler Rough-in/Hydro | 2/11/2014 | 2/12/2014 | 2/12/2014 4:57:11 PM | P | NR |
|
|
Hydro Phone #: ###-#### >> Inspection requested via web by John Venche *pending water supply
|
BLD14-00273
| FIRE-Final Inspection | 2/12/2014 | 2/12/2014 | 2/12/2014 2:46:47 PM | P | PASS |
|
|
Life safety okayed pending "door to remain....." signage and cover at one junction box. To be completed prior to structural final inspection.
|
FIR14-00033
| INSP-Sprinkler Rough-in/Hydro | 2/11/2014 | 2/12/2014 | 2/12/2014 2:43:43 PM | P | PART |
|
|
Provide quick response SW heads at four locations below overhead doors, noted two uprights at the SW corner not yet changed to QR. Final pending corrections, escutcheons and project finishes.
|
BLD13-02844
| FIRE-Final Inspection | 2/7/2014 | 2/12/2014 | 2/12/2014 10:51:21 AM | A | PASS |
|
|
Fire life safety inspection completed satisfactory.
|
FIR13-00315
| INSP-Supply line flush | 2/11/2014 | 2/12/2014 | 2/12/2014 10:50:06 AM | A | NR |
|
|
|