Inspections for the day of: Thursday, February 12, 2015.
Number of inspections: 10
Percentage of inspections complete: 70 %
Percentage of inspections not complete: 30 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR14-00870 INSP-Final Inspection2/5/20152/10/2015 P 
Forrest, The school district would like to schedule the test for 3:30 on Tuesday if at all possible. Please let me know as soon as possible if that will work so I can confirm it with them. Thank you. Jason ###-#### Phone #: ###-#### >> Inspection requested via web by Jason Minnick
FIR14-00708 INSP-Sprinkler Rough-in2/10/20152/10/2015 P 
Rough to cover 2nd floor F. ###-#### Phone #: ###-#### >> Inspection requested via web by Scott Carter II
FIR14-00681 INSP-Sprinkler Rough-in/Hydro2/10/20152/10/2015 P 
Partial rough to cover bldg D 1st floor (soffits/hard lids ) ###-#### Leroy >> Inspection requested via web by Scott Carter II
FIR14-00815 INSP-Sprinkler Rough-in2/10/20152/12/20152/13/2015 7:48:45 AMPPART
Completed rough-in inspection for the 2nd floor section one living units north side of corridor only. Noted missing head at the NW corner unit, overspaced coverage at unit 233.
FIR15-00100 INSP-Alarm Testing2/11/20152/12/20152/12/2015 3:57:19 PMPPASS
Fire alarm work passed inspection and functional testing.
FIR14-00477 INSP-Sprinkler Rough-in2/10/20152/12/20152/12/2015 3:56:03 PMPNR
UG/Flush. Jeff C is your contact. Please call 1/2 hour prior to inspection. Phone #: ###-#### Inspection requested via web by Stan Beus
BLD14-03570 FIRE-Final Inspection2/12/20152/12/20152/12/2015 3:25:39 PMPFAIL
Correction notice items include; repair exit signs and EM lights, fire extinguishers are overdue annual certification, storage array does not meet plan review guidelines regarding height, pile parameters or isle width, noted open junction boxes, door hardware needs revised, etc. Occupancy or use is not approved at this time.
FIR14-00918 INSP-Final Inspection2/12/20152/12/20152/12/2015 3:13:32 PMPPART
Scope of work as indicated on permit documents completed and passed inspection. Final pending changes to storage array to meet min. guidelines, removal of decking at joists above the office areas east side.
FIR14-00681 INSP-Sprinkler Rough-in2/11/20152/12/20152/12/2015 3:05:29 PMPPART
Okayed for cover hard lid soffit ceilings completed to date as noted and initialed on approved plan sheet- partial areas only, building section D.
FIR14-00478 INSP-Sprinkler Rough-in/Hydro2/12/20152/12/20152/12/2015 1:22:25 PMPCANC
This is an UG/Hydro inspection. Jeremiah is your contact. Please call 1/2 hour prior to inspection. Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus