FIR14-00870
| INSP-Final Inspection | 2/5/2015 | 2/10/2015 | | P | |
|
|
Forrest, The school district would like to schedule the test for 3:30 on Tuesday if at all possible. Please let me know as soon as possible if that will work so I can confirm it with them. Thank you. Jason ###-#### Phone #: ###-#### >> Inspection requested via web by Jason Minnick
|
FIR14-00708
| INSP-Sprinkler Rough-in | 2/10/2015 | 2/10/2015 | | P | |
|
|
Rough to cover 2nd floor F. ###-#### Phone #: ###-#### >> Inspection requested via web by Scott Carter II
|
FIR14-00681
| INSP-Sprinkler Rough-in/Hydro | 2/10/2015 | 2/10/2015 | | P | |
|
|
Partial rough to cover bldg D 1st floor (soffits/hard lids ) ###-#### Leroy >> Inspection requested via web by Scott Carter II
|
FIR14-00815
| INSP-Sprinkler Rough-in | 2/10/2015 | 2/12/2015 | 2/13/2015 7:48:45 AM | P | PART |
|
|
Completed rough-in inspection for the 2nd floor section one living units north side of corridor only. Noted missing head at the NW corner unit, overspaced coverage at unit 233.
|
FIR15-00100
| INSP-Alarm Testing | 2/11/2015 | 2/12/2015 | 2/12/2015 3:57:19 PM | P | PASS |
|
|
Fire alarm work passed inspection and functional testing.
|
FIR14-00477
| INSP-Sprinkler Rough-in | 2/10/2015 | 2/12/2015 | 2/12/2015 3:56:03 PM | P | NR |
|
|
UG/Flush. Jeff C is your contact. Please call 1/2 hour prior to inspection. Phone #: ###-#### Inspection requested via web by Stan Beus
|
BLD14-03570
| FIRE-Final Inspection | 2/12/2015 | 2/12/2015 | 2/12/2015 3:25:39 PM | P | FAIL |
|
|
Correction notice items include; repair exit signs and EM lights, fire extinguishers are overdue annual certification, storage array does not meet plan review guidelines regarding height, pile parameters or isle width, noted open junction boxes, door hardware needs revised, etc. Occupancy or use is not approved at this time.
|
FIR14-00918
| INSP-Final Inspection | 2/12/2015 | 2/12/2015 | 2/12/2015 3:13:32 PM | P | PART |
|
|
Scope of work as indicated on permit documents completed and passed inspection. Final pending changes to storage array to meet min. guidelines, removal of decking at joists above the office areas east side.
|
FIR14-00681
| INSP-Sprinkler Rough-in | 2/11/2015 | 2/12/2015 | 2/12/2015 3:05:29 PM | P | PART |
|
|
Okayed for cover hard lid soffit ceilings completed to date as noted and initialed on approved plan sheet- partial areas only, building section D.
|
FIR14-00478
| INSP-Sprinkler Rough-in/Hydro | 2/12/2015 | 2/12/2015 | 2/12/2015 1:22:25 PM | P | CANC |
|
|
This is an UG/Hydro inspection. Jeremiah is your contact. Please call 1/2 hour prior to inspection. Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|