ESC13-01160
| General Inspection | 2/12/2015 | 2/12/2015 | 2/12/2015 3:37:39 PM | | PASS |
|
|
Maverik is complete and open for business. Need to install final landscaping and ground cover. No disturbed areas or issues.
|
ESC14-00545
| Aging Inspection | 2/12/2015 | 2/12/2015 | 2/12/2015 2:28:08 PM | | PASS |
|
|
Near completion. Site is mostly clean. Pine Tree Village still scheduled to have Grey Pine and Pine Nut swept Friday or Saturday. Will check back next week. No new corrections or issues for this home.
|
ESC14-00299
| Site Preparation | 2/11/2015 | 2/12/2015 | 2/12/2015 1:59:41 PM | A | PART |
|
|
Hillside has been excavated and is contained within previosly installed cement retaining wall. No activity at time of inspection. No trackout or isssues, permit is posted.
correction:
Install DI protection in storm drain in fron of lot.
|
ESC14-00403
| Aging Inspection | 2/12/2015 | 2/12/2015 | 2/12/2015 12:19:32 PM | | PASS |
|
|
WIP. No trackout to Warm Springs.
Need to sweep driveway apron and bikelane is all. No other violations.
|
ESC14-00683
| Site Final | 2/11/2015 | 2/12/2015 | 2/12/2015 11:34:52 AM | A | PASS |
|
|
Dan Appel Phone #: ###-#### Inspection requested via web by Daniel Appel
Construction complete, site mostly stabilized with some final landscaping in progress. Any loose sediment will be swept at end of day.
Permit conditions satisfied. Site final approved.
|
ESC14-00683
| DOC - Permit Finaled | 2/12/2015 | 2/12/2015 | 2/12/2015 11:30:18 AM | P | PASS |
|
|
|
ESC14-00748
| Aging Inspection | 2/12/2015 | 2/12/2015 | 2/12/2015 10:41:08 AM | | PASS |
|
|
Home complete, occupied, site cleaned, and landscaped. ESC permit conditions satisfied.
|
ESC14-00748
| DOC - Permit Finaled | 2/12/2015 | 2/12/2015 | 2/12/2015 10:40:34 AM | P | PASS |
|
|
|
ESC14-00953
| Random Inspection | 2/12/2015 | 2/12/2015 | 2/12/2015 10:37:39 AM | A | PASS |
|
|
WIP. No sediment leaving site (no MS4 infrastructure in area), no trackout. Permit posted on back fence.
|
ESC14-00869
| Aging Inspection | 2/12/2015 | 2/12/2015 | 2/12/2015 10:13:01 AM | | PASS |
|
|
Home demolished, lot cleaned. Broken into two parcels, east parcel has new home under construction.
Lot is vegetated; note - there is no MS4 infrastructure and a large pothole is adjacent to site and appears to be unrelated to the construction activities.
|
ESC14-00869
| DOC - Permit Finaled | 2/12/2015 | 2/12/2015 | 2/12/2015 10:07:13 AM | P | PASS |
|
|
|
ESC14-00081
| General Inspection | 2/12/2015 | 2/12/2015 | 2/12/2015 9:17:24 AM | | PASS |
|
|
|
ESC14-00381
| General Inspection | 2/12/2015 | 2/12/2015 | 2/12/2015 8:45:02 AM | | PASS |
|
|
Stockpile is currently inactive. A earthen berm blocks access to trespassers and also diverts runoff to stormwater pond.
No trackout or sediment runoff to Windsong, no dust, stockpile is stabile.
|